1 / 11

Agenda

Agenda. https://indico.cern.ch/conferenceDisplay.py?confId=181008. End 12:00 . Workpackage overview – R. Folch (25’ + 5’) Functional requirements of the BIDs – R. Folch (5’ + 5’) FLUKA simulations - A. Christov (15’ + 5’) Thermo-mechanical analysis – M. Delonca (25’ + 5’)

giles
Download Presentation

Agenda

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agenda https://indico.cern.ch/conferenceDisplay.py?confId=181008 End 12:00 Workpackage overview – R. Folch (25’ + 5’) Functional requirements of the BIDs – R. Folch (5’ + 5’) FLUKA simulations - A. Christov (15’ + 5’) Thermo-mechanical analysis – M. Delonca (25’ + 5’) BREAK (15’) Conceptual and detailed design – M. Fürtinger (25’ + 5’) Controls for movable BIDs – R. Folch (10’ + 5’) Manufacturing strategy – R. Folch (15’) Discussion – All (15’) R. Folch EN/STI - BID Workpackage Review - March 2012

  2. II. Functional requirements Reference document R. Folch EN/STI - BID Workpackage Review - March 2012

  3. General specification R. Folch EN/STI - BID Workpackage Review - March 2012

  4. To allow the operation of the linac while the synchrotron is open for access Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012

  5. To suppress the beam halo, to reduce the beam size and to measure the beam Beam Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012

  6. Horizontal: to intercept particles from scrapers. Vertical: to dump on request Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012

  7. To stabilize and diagnose beam spills for clinical purpose Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012

  8. To stop the beams in the irradiation rooms, as a second protection measure Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012

  9. For beam commissioning and accelerator performance check Pulse Interval R. Folch EN/STI - BID Workpackage Review - March 2012

  10. Agenda https://indico.cern.ch/conferenceDisplay.py?confId=181008 End 12:00 Workpackage overview – R. Folch (25’ + 5’) Functional requirements of the BIDs – R. Folch (5’ + 5’) FLUKA simulations - A. Christov (15’ + 5’) Thermo-mechanical analysis – M. Delonca (25’ + 5’) BREAK (15’) Conceptual and detailed design – M. Fürtinger (25’ + 5’) Controls for movable BIDs – R. Folch (10’ + 5’) Manufacturing strategy – R. Folch (15’) Discussion – All (15’) R. Folch EN/STI - BID Workpackage Review - March 2012

  11. Reference document R. Folch EN/STI - BID Workpackage Review - March 2012

More Related