Soft Landings Process Concept Map. Completion. 0. Portfolio Management. 1. Briefing. 2. Concept. 3. Design Development. 4. Production. 5. Installation. 6. As-constructed. 7. In-use. SL Stages. 1. Briefing. 2. Design and Construction. 3. Handover. 4. Initial Aftercare.
E N D
Soft Landings Process Concept Map Completion 0. Portfolio Management 1. Briefing 2. Concept 3. Design Development 4. Production 5. Installation 6. As-constructed 7. In-use SL Stages 1. Briefing 2. Design and Construction 3. Handover 4. Initial Aftercare 5. Long Aftercare Client Role Design Team Role Contractor Role Building Manager Role 1 2 3 4 5 n BIM Data Drop