1 / 6

WOC2: Underground Storage (UGS)

IGU: 2006 – 2009 TWP Preparation. WOC2: Underground Storage (UGS). STUDY TOPICS DESCRIPTION. SG 2.1.: UGS Database Continuity in database development Enlarging database , eg : eruption events emergency events remediation split between oil and gas fields

gina
Download Presentation

WOC2: Underground Storage (UGS)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IGU: 2006 – 2009 TWP Preparation WOC2: Underground Storage (UGS)

  2. STUDY TOPICS DESCRIPTION SG 2.1.: UGS Database • Continuity in database development • Enlarging database, eg: • eruption events • emergency events • remediation • split between oil and gas fields • incorporation of pipeline systems related to UGS • national trends of UGS industry

  3. SG 2.2.: UGS Technology Improvements • Horizontal drilling and long-term stability of wells • Formation Damage mechanisms  and the most serious problems in the various regions of the world, the remediation practices • Well Bore Integrity -what tools are used for determination.  New Technologies in downhole logging, mechanical integrity testing  • Cement bonding and how it relates specifically to gas storage wells. Cement deterioration and determination • Investment savings – alternative cushion gases etc.

  4. SG 2.3.: Intelligent UGS • Automation in dataflow from Scada to reservoir engineering and continuos analyses and process evaluation • ICT, reservoir management and technology • Data mining and artificial intelligence • Coupled simulation, technology/reservoir • Optimization, monitoring, operation safety • Cost savings

  5. IGU: 2006 – 2009 TWP Preparation Topic Summary *Best practices summary from relevant committees to be analysed

  6. IGU: 2006 – 2009 TWP Preparation Action Plan / TWP Milestones *Will be attached to Secretariat’s formal request to Charter/Associate members for WOC/PGC participants

More Related