1 / 7

Action plan in connection with Axis 4 Leader – measures and activities

Action plan in connection with Axis 4 Leader – measures and activities. 2012 Jela Tvrdoňová. Strategic objective. I n t e r v e n tion. Specific objective. Measures,activities. Financial plan. Action plan. Methodological description of action plan elaboration. Quality of elaboration

gino
Download Presentation

Action plan in connection with Axis 4 Leader – measures and activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Action plan in connection with Axis 4 Leader – measures and activities 2012 Jela Tvrdoňová

  2. Strategic objective I n t e r v e n tion Specific objective Measures,activities Financial plan Action plan

  3. Methodological description of action plan elaboration Quality of elaboration • Proper explanation of the selected measures, which shall be justified in line with the SWOT • Selection of eligible activities within each measure and their verifiable justification supported by the SWOT • Particular measures can be attached to several objectives, but implemented by different eligible activities directly related to them. The judgment must verify if selected activities are relevant to these objectives and can help to achieve them • Detailed elaboration of measures and eligible activities in the Annex 4 of the Strategy document • The interlinks and logic of selected activities and measures in connection with objectives and development priorities

  4. Logic in connection with other parts of the strategy • Inter-link of proposed measures and/or eligible activities with special view on the eligible activities attached to particular specific objectives, and their contribution to these objectives fulfillment • Interlink of measures with the proposed financial plan, in more specific – if the financial allocations within each measure are sufficient to create the whished change within each priority and help to achieve objectives • Interlink of eligible activities on the strategy monitoring framework mainly the relevance of additional monitoring indicators and if they allow to measure outputs at the activity and measure level.

  5. Importantquestions to beasked (eachquestionranking 1 – 5, 1 – worst, 5 – best) • Proper explanation of the links among specific objectives – measures and activities • The use of particular measures and activities is properly justified in favor of solving key problems of the territory • The contribution of selected activities to the objective achievement is obvious and sufficient in given time

  6. Working group • 4 – 5 members • Discusion to the example and ranking the result

  7. Thank you for your attention

More Related