European Grid Development, Market Development and Renewable Energy

European Grid Development, Market Development and Renewable Energy. International Energy Conference Copenhagen, 12 March 2008. Peter Jørgensen Vice President, Planning. Agenda. Third Package - Infrastructure Development Unique Role of TSO’s From National to Regional and European Planning

Download Presentation

European Grid Development, Market Development and Renewable Energy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. European Grid Development, Market Development and Renewable Energy International Energy Conference Copenhagen, 12 March 2008 Peter Jørgensen Vice President, Planning New Tasks, New Tools

  2. Agenda • Third Package - Infrastructure Development • Unique Role of TSO’s • From National to Regional and European Planning • From Planning to Investment Decisions – Incentives and Criteria’s • Public Authorization Procedures New Tasks, New Tools

  3. Third Liberalization Package - infrastructure development • Unbundling • Avoid distorted investment incentives within integrated companies • Strong national regulators • Review investment plans of TSOs • Monitor network security and reliability • ACER – Agency for the Cooperation of Energy Regulators • Perform regulatory oversight of ENTSO – 10-year investment plans • Decide on regulatory regime applicable to infrastructure • ENTSO – European Network of Transmission System Operators • Identify, manage and finance research and innovation • Coordinate grid operation according to agreed codes • Perform investment planning – coordinated long term planning • Prepare system adequacy forecasts for summer, winter and long term New Tasks, New Tools

  4. Responsibility of TSO’s - from long term planning to real-time operation and settlement -25 year -1 month -1 year -1 week -1 day Real-time Operation Planning and R&D Building and maintenance of infrastructure System operation Market operation and settlement Unique strength of TSOs to embrace the full responsibility! New Tasks, New Tools

  5. Nordic Grid Master Plan 2008 • Nordel Scenarios for 2015 and 2025 • Proposals for internal and external reinforcements From National to Regional Planning- the Nordel example • 3 Nordic Grid Master Plans in last 10 years • Reinforcements in 5 prioritized cross sections proposed in 2004 • Comprehensive analysis based on common data and models • 4 projects decided – 1 pending New Tasks, New Tools

  6. Security of supply • power and energy balances – statistics and modeling • margins to market failure and system failure – statistics and modeling Nordic Grid Master Plan • Market functioning • Price formation in the integrated NordPool spot market – statistics and modeling New Tasks, New Tools

  7. Investments • Level for infrastructure investments will be tripled Nordic Grid Master Plan • Reinforcements • Internal and external reinforcements analyzed • Reinforcement of external Nordic interconnections in general shows a positive cost-benefit New Tasks, New Tools

  8. Alternative 1 Sweden Glentegård Norge Skagerrak SK 1&2 SK 3&4 Konti-Skan KS 1&2 Ishøj Vester Hassing København Ferslev OVerloaded connections Overload > 150 % Overload > 125 <= 150 % Overload <= 125 % Tjele Tjele Idomlund Trige Sweden Gørløsegård Askær Hovegård Landerupgård Herslev Storebælt Bjæverskov Endrup SB 1&2 Fraugde Kingstrup Kassø Kontek Rødsand Germany Germany Danish Grid Development • Major reinforcements will be triggered by international power market and off-shore wind • Urgent need for: • New guidelines on the use of overhead lines/underground cables • Efficient and faster public authorisation procedures New Tasks, New Tools

  9. Detected Bottlenecks during n-1 conditions of UCTE “Scenario North” source: EWIS study Obvious need for planning and investment decisions on European level! New Tasks, New Tools

  10. Optimal interconnector capacity differs significantly between private and socio-economic welfare criteria’s From planning to investment decisions - incentives and criteria’s for investment decisions • New interconnector capacity may cause considerable redistribution of wealth compared to the net socio-economic benefit - distributed in several countries! Gen Con Cap Net Regulation, allocation of congestion rents & compensation mechanisms must support socio-economic optimal investments on regional/European level! New Tasks, New Tools

  11. Summary Some basic prerequisites for the timely development of infrastructure to support a well-functioning European electricity market, security of supply and massive integration of RES are: • Efficient TSO-cooperation on European and regional level • coordinated and qualified planning procedures and investment decisions • Strong national and European regulation • investment criteria’s based on socio-economic welfare • incentives for investments supporting goals on regional and European level • Politically supported guidelines for new infrastructure • Efficient public authorization procedures New Tasks, New Tools