1 / 24

Summary of the IWLC Workshop 2010 Combined sessions WG5 (MDI) + WG8

Summary of the IWLC Workshop 2010 Combined sessions WG5 (MDI) + WG8. Lau Gatignon, Edda Gschwendtner. Machine Detector Interface. The CLIC Interaction Region: One IP, Two Experiments.  Both detectors on same type of platform. Comparison between the two Detectors.

gisela
Download Presentation

Summary of the IWLC Workshop 2010 Combined sessions WG5 (MDI) + WG8

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Summary ofthe IWLC Workshop 2010Combined sessions WG5 (MDI) + WG8 Lau Gatignon, Edda Gschwendtner

  2. Machine Detector Interface

  3. The CLIC Interaction Region: One IP, Two Experiments  Both detectors on same type of platform

  4. Comparison between the two Detectors CLIC-ILD (4T), L*=4.3m CLIC-SiD (5T), L*=3.5m

  5. Layout Inner and Outer Support Tube

  6. Pre-Isolator for QD0 (+QF1)

  7. Passive Isolation: Pre-Isolator for FF quads • Model for simulations • already very detailed

  8. Passive Isolation: Pre-Isolator for FF quads Vertical ground motion with pre-isolator Pre-isolator prototype under tests (H. Gerwig et al.)

  9. CLIC QD0

  10. CLIC QD0 Short Prototype

  11. Cantilever FF Stabilization

  12. Cantilever FF Stabilization

  13. CLIC QD0 Pre-Alignment H.Mainaud

  14. Vacuum System Unbaked Pressure Profile in QD0 Ray Veness / CERN-TE-VSC

  15. Vacuum System BaselineSectorization Scheme

  16. Post-Collision Main Beam Dump

  17. Post-Collision Main Beam Dump Particle Distribution at Entrance Window • Improve design on beam dump • CLIC-ILC working group on beam dump?

  18. Additional Slides

  19. Expected latency at CLIC: 37 nsec

  20. Test of a digital system (for ILC) at ATF2:

More Related