LCLS-II : Latest Layout (stay tuned for endless revisions)

LCLS-II : Latest Layout (stay tuned for endless revisions). P. Emma Oct. 6 , 2010. SLAC. LCLS-II Goals. LCLS-II is step along the way to LCLS-2025 … LCLS-II will use 2 nd km of SLAC linac to provide independent electron source (sectors 10-20)

gitel
Download Presentation

LCLS-II : Latest Layout (stay tuned for endless revisions)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LCLS-II: Latest Layout(stay tuned for endless revisions) P. EmmaOct. 6, 2010 SLAC

  2. LCLS-II Goals LCLS-II is step along the way to LCLS-2025… LCLS-II will use 2nd km of SLAClinac to provide independent electron source (sectors 10-20) Build new soft x-ray FEL from 0.25 to 1.8 keV Build new hard x-ray FEL up to 13 keV Price cap presently set at 400 M$ Build new undulator tunnel to allow easy expansion in the future (civil construction now) To fit within price cap, feed both new FELs (HXR & SXR) in series with one electron transport line

  3. Schematic Layout of LCLS-II New undulator tunnel (~200 m long?) New Hard X-ray FEL with adjustable-gap undulator New Soft X-ray FEL with adjustable-gap undulator Und. Hall-1 gun-2 gun-1 NEH-1 3.5-14 GeV sectors 10-20 sectors 20-30 LCLS-I 0.5-10 keV LCLS-I LCLS-II LCLS-II NEH-2 3.5-14 GeV 4-13 keV 0.25-1.8 keV Und. Hall-2 All electron beamlines support up to 14 GeV at 120 Hz 3 FELs and 2 Electron Sources (+ more later)

  4. LCLS-2025 ? 4-5 FELs with 2-3 independent electron sources Add 3rd km of linac? Don’t take this too seriously yet Und. Hall-1 gun-2 gun-1 20 keV NEH-1 3.5-14 GeV sectors 10-20 sectors 20-30 LCLS-I 0.5-10 keV LCLS-I LCLS-II LCLS-II 5-20 keV NEH-2 3.5-14 GeV 0.2-2 keV Und. Hall-2 All electron beamlines support up to 14 GeV at 120 Hz and at least 2 bunches per RF pulse 4-5FELs and 2-3 Electron Sources

  5. LCLS-II: New Injector, Accelerator, & Bypass RF gun-1 enclosure exists at sector 10 L0 3.5-14 GeV RF gun-2 undulator 3.5-14 GeV e- bypass line X new undulators L1 BC1 L2 BC2 L3 L0 3.5-14 GeV existing LCLS X L1 BC1 L2 BC2 L3 sector-10 sector-14 sector-20 sector-24 und-hall sector-30 Sector-20 wall Use 2nd km of SLAC linac (sector 10 to 20) – greater flexibility 3-14 GeV energy at 120-Hz beam rate; or 3-7 GeV energy (no SLED) allowing 360-Hz beam rate Preserves possibility of up to 28 GeV (and still 1 more km left!)

  6. LCLS-IITimeline, Compatible with Operations 400 M$ CDR R&D Installation ED&I Fabrication CD-4 CD-2, -3 CD-0 CD-1 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17 Start Injector Construction Phase-1 Installation Phase-2 Installation Annual 3 month summer downtime CD-0 is done and CD-1 set for April 2011. The remainder is not locked down yet.