Additional Clarification Points From Assembly. 240. Change 1: 1-ABC10-20-30-40-50DO600--p. 240. Joints at the module section area for the planar coils were not mountable with the previous design. Lid of the port should be increased to allow for shifting of joints in z-direction. 600.
E N D
Change 1: 1-ABC10-20-30-40-50DO600--p 240 Joints at the module section area for the planar coils were not mountable with the previous design
Lid of the port should be increased to allow for shifting of joints in z-direction 600 Configuration check done by SE Change is agreed and approved (see 1-ABC-P0000) Shifting of joints
Change 2: 1-ABC xx BS xxx—p Not yet implemented QD-port (port-qdd) Length 500 -550 mm Diameter 800 mm 10 ports (1/half-modul), not symmetric located
Change 2: 1-ABC xx BS xxx--p • each QD port should be extended to 600 mm by an additional part • configuration check still outstanding • Calculation regarding additional reinforcement of Dome required 600
Access for repair of the planar coil joints: Are there any other Man access ports that have been reduced in diameter? • Example • 1-abc11do800: • - access to the inter layer joints • 1-abc11ml300: • access to the coil terminal joints • inner diameter only 478 mm • access agreed with safety department 1-abc11do800 Inner diameter 600mm 1-abc11ml300 Inner diameter 478mm
Assembly of current lead joints joints Access is only possible if all dome parts can be removed during assembly Current lead joint (cold side) within this dome parts