170 likes | 305 Views
CNG in a Municipal Fleet. October 19, 2012 Empire Clean Cities AVT Conference, Lehman College, NY Joseph (Bud) Nicoletti, Jr., P.E . Commissioner of Public Works/City Engineer The City of White Plains. Compressed Natural Gas. DGE of $1.90 vs. $3.00+ Lowered emissions Much quieter
E N D
CNG in a Municipal Fleet October 19, 2012 Empire Clean Cities AVT Conference, Lehman College, NY Joseph (Bud) Nicoletti, Jr., P.E. Commissioner of Public Works/City Engineer The City of White Plains
Compressed Natural Gas • DGE of $1.90 vs. $3.00+ • Lowered emissions • Much quieter • No underground fuel tank; liability or operational issues • Eliminates current diesel engine complexities (DEF, exhaust regen, etc.) • Stationary engines as well as vehicles
More Info Needed? Joseph (Bud) Nicoletti, Jr., P.E. Department of Public Works The City of White Plains, NY 914-422-1210 jnicoletti@whiteplainsny.gov
FLNA Fleet 2012 Strategy Gino Porter Senior Fleet Manager, Fleet Operations
7th Largest Fleet in North America… 165 Propane 2013 Max MPG (30) 280 EV’s 1 Million Miles 67 NGV 900,000 Gallons Saved Annually
In 2012 the pipeline grew stronger and the tactics are accelerating… STUDY Trailer Geometry Hydrogen Solar PHEV PILOT Propane Next Gen Aero 30 MPG Truck CNG/LNG IMPLEMENT Aerodynamic Tractor Trailer Electric High Efficiency Route Truck GPS
Most Fuel-Efficient Fleet in America through People, Process, & Technology… 2012 2020 2010 2008 47.8 45.7 43.4 GPS, Idle Reduction Tactics, Road To Green, Top Gun, Aero Dynamics, Aux Heaters, Idle Shutdowns, Tire Inflation, Rolling Resistance, RTRR. 41.2 39 37 35 33 31 29 27 25 23 50% 14% ‘08 ‘09 ‘10 ‘11 ‘12 ‘13 ‘14 ‘15 ‘16 ‘17 ‘18 ‘19 ‘20
Greg Brayman Phoenix Beverage/ Demon Logistics
ARRA Funded Vehicles • 4-CNG 2011 F-550 • 2 CNG Freightliner M112
Joseph Berman Price Chopper
PC EV Charging Station Ecosystem Development Project • Goal: Most densely networked privately held EV charging station ecosystem in the Northeast. • Motivations: public benefit, GHG reduction, technology transfer, green jobs • PON 2301 NYSERDA grant funding for initial NYS deployment • Pilot location in Niskayuna, NY – November 2012 anticipated activation • PON 2301 First Round Funding: Capitol region cluster (4 Locations) • PON 2301 Second Round Funding: Rt 90 and Syracuse Cluster (8 proposed locations) • 6 State roll out strategy • Strategic Partnership with General Electric
GE WattStation EVSE Technology • Retractable cord • Modular upgrades • Safety First: Features NEMA 3R indoor/outdoor rating and meets all UL and fire safety standards • Easy to Use: Level II charging with service needs of 208-240VAC at 40A. • Manage, Monitor and Maintain: Web enabled (Cloud based) hosting • PC EV Ecosystem usage will be free to the public for the foreseeable future.
Capitol Region Cluster • 442 Balltown Rd. Schenectady, NY • 1892 Central Ave., Albany, NY • 15 Park Ave, Clifton Park, NY • 1395, New Scottland Rd., Slingerlands • 873 New Loudon Rd. Latham
Proposed I90/Syracuse Alternative Transportation Route Locations: • 4731 Onondaga Blvd, Syracuse, NY • 2515 Erie Blvd, East Syracuse, NY • 5701 E. Circle Drive, Cicero, NY • 3863 State Route 31, Liverpool, NY • 1790 Black River Blvd, Rome, NY • 1917 Genesee St., Utica, NY • 6025 NYS Route 5, Palatine Bridge, NY • 139 Sanford Farms Plaza, Amsterdam, NY