Welcome & Introductions • Consultant: EMH&T • Travis Eifert, PE • Nick Shultz, PE • City of Upper Arlington • Tom Komlanc, PE
Presentation Outline • Purpose & Need • Roadway, waterline, storm sewer • Safety Enhancements • Transportation • Opportunities • Gateway Enhancements • Bikeway & Pedestrian Facilities • Alternatives & Public Involvement • Recommendations • Funding & Phasing Timeline
Purpose & Need (Waterline) • Records indicate the line was placed into service in 1930’s. • There have been at least 4 documented water-main breaks within the last 10 years. • Recommended upsizing of the existing 6” line to 8” from North Star to Northwest to increase pressure & fire flows
Purpose & Need (Storm Sewer) • No defined storm sewer system • Flooding problems in 5yr event along Northwest • Does not meet current water quality requirements • Ponding in roadway adds to roadway failure
Purpose & Need (Safety) • Fire Accessibility • Roadway width • Parking • Not functional with current width and 2-way traffic • Traffic Calming • Connectivity to Schools • No regional pathway system throughout project • Does not connect to bike path on North Star
Purpose & Need (Transportation) Waltham Road too Narrow
Purpose & Need (Transportation) Waltham Road too Narrow Not Wide Enough for Two-Way Traffic and Dedicated Parking 25’ Wide Currently, Should Be ≥ 30’ 1/3 of Reported Crashes on Waltham Road Involve Parked Cars Increased Emergency vehicle response time
Purpose & Need (Transportation) Waltham Road/Northwest Boulevard
Purpose & Need (Transportation) Waltham Road/Northwest Boulevard Crash Rate is Over Twice the Statewide Average for a Similar Type Facility Excessive Delays for Eastbound and Westbound Traffic Crossing Northwest Boulevard Poor Viewing Angle on East Leg Looking South Incorrect lane usage for vehicles turning northbound from Edgement to Northwest
Purpose & Need (Transportation) Lack of Pedestrian Features
Alternatives & Public Involvement • Handouts & Discussion • Pavement Section & Parking • Northwest/Waltham • Sidewalk or Multi-use Path • Kinnear / Waltham / North Star
Recommendations • Handouts & Discussion • Concept I • Concept II • Preferred Alternative
Funding and Phasing Timeline • Phase I (Feb. 2011 – Aug. 2011) • Budget $1,336,500.00 • Water $ 565,000.00 • Storm $ 124,500.00 • Roadway $ 525,500.00 • Insp./PM $ 121,500.00 • Phase II (April 2012 – Oct. 2012) • Budget $1,380,225.00 • Storm $ 303,000.00 • Roadway $ 951,750.00 • Insp./PM $ 125,475.00
Funding and Phasing Timeline • Phase III (TBD) • Budget $1,045,500.00 • Right of way $ 150,000.00 • Storm $ 200,000.00 • Roadway $ 750,500.00 • Insp./PM $ 95,000.00