1 / 18

Waltham Road

Waltham Road. (Andover – North Star). Welcome & Introductions. Consultant: EMH&T Travis Eifert, PE Nick Shultz, PE City of Upper Arlington Tom Komlanc, PE. Presentation Outline. Purpose & Need Roadway, waterline, storm sewer Safety Enhancements Transportation Opportunities

giza
Download Presentation

Waltham Road

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Waltham Road (Andover – North Star)

  2. Welcome & Introductions • Consultant: EMH&T • Travis Eifert, PE • Nick Shultz, PE • City of Upper Arlington • Tom Komlanc, PE

  3. Presentation Outline • Purpose & Need • Roadway, waterline, storm sewer • Safety Enhancements • Transportation • Opportunities • Gateway Enhancements • Bikeway & Pedestrian Facilities • Alternatives & Public Involvement • Recommendations • Funding & Phasing Timeline

  4. Purpose & Need (Roadway)

  5. Purpose & Need (Waterline) • Records indicate the line was placed into service in 1930’s. • There have been at least 4 documented water-main breaks within the last 10 years. • Recommended upsizing of the existing 6” line to 8” from North Star to Northwest to increase pressure & fire flows

  6. Purpose & Need (Storm Sewer) • No defined storm sewer system • Flooding problems in 5yr event along Northwest • Does not meet current water quality requirements • Ponding in roadway adds to roadway failure

  7. Purpose & Need (Safety) • Fire Accessibility • Roadway width • Parking • Not functional with current width and 2-way traffic • Traffic Calming • Connectivity to Schools • No regional pathway system throughout project • Does not connect to bike path on North Star

  8. Purpose & Need (Transportation) Waltham Road too Narrow

  9. Purpose & Need (Transportation) Waltham Road too Narrow Not Wide Enough for Two-Way Traffic and Dedicated Parking 25’ Wide Currently, Should Be ≥ 30’ 1/3 of Reported Crashes on Waltham Road Involve Parked Cars Increased Emergency vehicle response time

  10. Purpose & Need (Transportation) Waltham Road/Northwest Boulevard

  11. Purpose & Need (Transportation) Waltham Road/Northwest Boulevard Crash Rate is Over Twice the Statewide Average for a Similar Type Facility Excessive Delays for Eastbound and Westbound Traffic Crossing Northwest Boulevard Poor Viewing Angle on East Leg Looking South Incorrect lane usage for vehicles turning northbound from Edgement to Northwest

  12. Purpose & Need (Transportation) Lack of Pedestrian Features

  13. Opportunities (Bike / Ped.)

  14. Opportunities (Gateways)

  15. Alternatives & Public Involvement • Handouts & Discussion • Pavement Section & Parking • Northwest/Waltham • Sidewalk or Multi-use Path • Kinnear / Waltham / North Star

  16. Recommendations • Handouts & Discussion • Concept I • Concept II • Preferred Alternative

  17. Funding and Phasing Timeline • Phase I (Feb. 2011 – Aug. 2011) • Budget $1,336,500.00 • Water $ 565,000.00 • Storm $ 124,500.00 • Roadway $ 525,500.00 • Insp./PM $ 121,500.00 • Phase II (April 2012 – Oct. 2012) • Budget $1,380,225.00 • Storm $ 303,000.00 • Roadway $ 951,750.00 • Insp./PM $ 125,475.00

  18. Funding and Phasing Timeline • Phase III (TBD) • Budget $1,045,500.00 • Right of way $ 150,000.00 • Storm $ 200,000.00 • Roadway $ 750,500.00 • Insp./PM $ 95,000.00