An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A Suggested Methodological Framework for Evaluating and Selecting an Open Source LMS Dr Philip Uys <puys@csu.edu.au> Manager, Educational Design and Educational Technology, Centre for Enhancing Learning and Teaching Matt Morton-Allen <mmorton-allen@csu.edu.au> Teaching, Learning and Community Source Liaison Officer Division of Information Technology

  2. Introduction • Set out in Feb 2006 to enhance the virtual learning environment • Became the Online Learning Environment (OLE) Programme • Originally focused on individual tools but morphed to framework emphasis • Started with 12 possible solutions • Mix of open source, commercial and in-house options • Ended with two open source • Selected Sakai

  3. Fast Track Approach • Initially used “fast track” approach • Attempted to avoid lengthy investigation of requirements • Focus on reusing previously supplied high level business requirements • Success hinged on ability to easily identify low risk solution

  4. Fast Track Approach (cont.) • Reality was that too little information meant too many options • Too many options meant too high a risk • High risk combined badly with lack of process transparency • Also did little to bring together cross-silo issues between requirements

  5. A Different Approach • Once “fast track” abandoned needed alternative • Extensive experience in the group not sufficient to address OSS complexities • Short environment scan showed two possible frameworks: • Business Readiness Rating • Open Source Maturity Model

  6. Business Readiness Ratinghttp://www.openbrr.org/ • Geared at helping evaluate OSS • Identifies 12 criteria each with their own tests • Suggests only portion of these be applied • Assigns a weight to each test within a criteria giving end score • Has online records of submissions made by others

  7. Business Readiness Rating • When looked at closely BRR has some flaws • The measures of the tests within criteria are high level and generic • Leads to need to revise for local use • Or be faced with possibility of having undiminished pool of options • Either means you need to move beyond BRR for a final decision • In retrospect could have been useful early on as a filter

  8. Open Source Maturity Modelhttp://www.navicasoft.com/pages/osmm.htm • Another model that could be considered – but limited • The OSMM assesses the maturity level of all key product elements: • Software • Support • Documentation • Training • Product integration • Professional Services

  9. A Different Approach • When neither BRR or OSMM seemed to fit began to consider afresh • Agreed on the need for a framework that will be: • Flexible – willingness to adapt throughout • Aligned – consistent with strategy • Comprehensive – extensive and in-depth investigation • Transparent – rigorous debate • Devised the FACT framework for our own needs

  10. The FACT Framework • Identify requirements • Weigh the requirements • Identify possible solutions • Identify “killer” requirements • Apply “killer” requirements • Determine short list • Identify overarching concerns • Apply overarching concerns

  11. 1. Identify Requirements • Utilised collaborative process to create extensive (> 40) requirements list • Sources included strategy documents, feature lists from commercial and OSS products, team member experience • Split into high medium and low priority • Identified levels of compliance with each requirement or “criteria”

  12. 2. Weigh the Requirements • Next we gave a weighting to each requirement • Again followed a highly collaborative process • Required several iterations to get consensus • Split 1000 points over 40 requirements • Revised several weightings when unable to differentiate possible solutions • Always done in collaborative and transparent way

  13. 3. Identify Possible Solutions • Compiled list of possible solutions • Derived from a number of sources including team expertise, industry reports, peer institutions etc • Resulted in list of 12 options • It was hoped this might be trimmed

  14. 4. Identify Killer Criteria • Realised evaluating over 12 products against 40 requirements would take a long time • Decided some requirements were “show stoppers” and thus “killed” the option • Collaboratively decided which of the requirements had a criteria level that was unacceptable

  15. 5. Apply “Killer” Criteria • Applied killer criteria to each of possible solutions • Once a killer had been reached further analysis was stopped • Not all “killers” consider equal - some options needed more than one to be removed • Reduced the list of 13 options down to 5: • Blackboard, Angel, In-house, Moodle & Sakai

  16. 5. Apply “Killer” Criteria (cont.) • Removed options for a number of reasons: • Mergers • Insufficient local support • Small user base • Interestingly cost did not rule out any options at this point

  17. 6. Determine Short List • From the list of 5 we then removed: • Blackboard – concerns over lack of competition, little leverage to control costs • In-house – advantage of reinventing wheel questionable, OSS seemed to have same benefits without starting from scratch, lack of agility • Angel – user base too small, too high risk, detriments of commercial without benefits of size • Leaving us with Moodle and Sakai

  18. 7. Develop OACs • After many months of effort the quantitative analysis gave near identical scores: • Sakai – 2428, Moodle – 2402 • If quantitative comparisons had come up empty what about qualitative ones? • Developed “overarching concerns” or OACs: • Completely qualitative • Focus on general ideology not current features • Designed to ensure alignment between culture of solution and the University

  19. 7. Develop OACs (cont.) • Ended up with 10 OACs covering range of issues: • Was the community decision making centralised or decentralised? • Was the product enterprise oriented? • Was the product stronger in secondary or tertiary sectors? • Was the community more technically or more pedagogically focused?

  20. 8. Apply the OACs • Once compiled the OACs were applied to the short list of Moodle and Sakai • Four major stakeholder groups asked to decide on Sakai or Moodle for each OAC • End result looked like …

  21. 8. Apply the OACs (cont.)

  22. 8. Apply the OACs (cont.) • 3 of the 4 team members agreed but consensus could not be reached after intense debate • A final Steering Committee vote selected Sakaiunanimously …

  23. Observations • The deeper the analysis the more possible solutions you can remove • Shallow analysis using models such as BRR can be useful in early stages • Quantitative comparisons are less meaningful when you can change any aspect of the software – there’s lots of grey areas

  24. Observations (cont.) • The introduction of qualitative measures is unavoidable and should be accepted throughout • Qualitative comparison can only be accepted in an environment of transparent rigour • Qualitative measure can only follow quantitative comparison – it lacks conviction in isolation

  25. Observations (cont.) • Removing cost from the equation helped compare OSS and commercial • Assuming cost is near equal over a period of time removes bias and misconception (i.e. no “free lunch”) • Evaluations require consideration of local needs and politics – highly strategic decisions cannot be based on off shelf comparisons

  26. Observations (cont.) • Requiring consensus was time consuming but gave strength to the results: • Forced rigorous debate • Ensured transparency throughout • You cannot rush decisions this large – taking the time allowed a considered decision

  27. Observations (cont.) • The framework wouldn’t have worked outside the context of the project management methodology • A framework needs to be contextualised within the organisational culture and strategies

  28. A Different Approach The FACT framework • Flexible – willingness to adapt throughout • Aligned – consistent with strategy • Comprehensive – extensive and in-depth investigation • Transparent – rigorous debate.

  29. Thank You! Dr Philip Uys <puys@csu.edu.au> Manager, Educational Design and Educational Technology, Centre for Enhancing Learning and Teaching http://www.csu.edu.au/division/celt/exec_staff/philip.uys Matt Morton-Allen <mmorton-allen@csu.edu.au> Teaching, Learning and Community Source Liaison Officer For more information http://www.csu.edu.au/division/landt/interact/