Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010

Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010. Prepared By: Peter Romanov 1 and Ken Jensen 2 1 UMD/CICS 2 Raytheon MOS. ASI Gate 3 Review Appendix A – Review Entry and Exit Criteria. ASI Gate 3 Review Entry Criteria.

glenys
Download Presentation

Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 Review Appendix A September 14, 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Southern Hemisphere Automated Snow/Ice (ASI) Gate 3 ReviewAppendix ASeptember 14, 2010 Prepared By: Peter Romanov1 and Ken Jensen2 1 UMD/CICS 2 Raytheon MOS

  2. ASI Gate 3 Review Appendix A – Review Entry and Exit Criteria

  3. ASI Gate 3 Review Entry Criteria • Entry # 1 - A Development Project Plan (DPP) has been written. The Gate 3 reviewers have access to the review version of the DPP. • Entry # 2 - A Project Status Report (PSR) has been written. The Gate 3 reviewers have access to the review version of the PSR. • Entry # 3 - A Gate 3 Document (G3D) has been written. The Gate 3 reviewers have access to the review version of the G3D. • Entry # 4 - A Project Baseline Report (PBR) has been written. The Gate 3 reviewers have access to the review version of the PBR.

  4. ASI Gate 3 Review Exit Criteria • Exit # 1 - Project plan and DPP are satisfactory • Exit # 2 - Project status and PSR are satisfactory • Exit # 3 - Project baseline and PBR are satisfactory • Exit # 4 - Project risks are acceptable • Exit # 5 - Status of risk mitigation actions is acceptable • Exit # 6 - Project is ready for the Design phase

  5. ASI Stage 1 CDR –Entry Criteria # 1-6 • Entry # 1 - A Gate 3 Review Report (G3RR) has been written. The CDR reviewers have access to the review version of the PDRR. • Entry # 2 - A Development Project Plan (DPP) has been written. The CDR reviewers have access to the review version of the DPP. • Entry # 3 - An Operations Concept Document (OCD) has been written. The CDR reviewers have access to the review version of the OCD. • Entry # 4 - A Requirements Allocation Document (RAD) has been written. The CDR reviewers have access to the review version of the RAD. • Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD. • Entry # 6 - A Software Architecture Document (SWA) has been written. The CDR reviewers have access to the review version of the SWA.

  6. ASI Stage 1 CDR –Entry Criteria # 7-11 • Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The CDR reviewers have access to the review version of each DDD. • Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CDR reviewers have access to the review version of the VVP. • Entry # 9 - A Project Status Report (PSR) has been written. The CDR reviewers have access to the review version of the PSR. • Entry # 10- A Critical Design Document (CDD) has been written. The CDR reviewers have access to the review version of the CDD. • Entry # 11 - A Project Baseline Report (PBR) has been written. The CDR reviewers have access to the review version of the PBR.

  7. ASI Stage 1 CDR –Exit Criteria # 1-6 • Exit # 1 - G3R "Conditional Pass" items have been satisfactorily disposed of. • Exit # 2 – G3R "Defer" items have been satisfactorily disposed of. • Exit # 3– Stage 1 Operations concept and OCD are satisfactory. • Exit # 4– Stage 1 requirements identification is satisfactory. • Exit # 5- Stage 1 requirements analysis is satisfactory. • Exit # 6- Stage 1 requirements traceability is satisfactory.

  8. ASI Stage 1 CDR –Exit Criteria # 7-12 • Exit # 7 - Stage 1 requirements tracking plan is satisfactory • Exit # 8– Stage 1 algorithm theoretical basis and ATBD are satisfactory. • Exit # 9– Stage 1 software architecture and SWA are satisfactory. • Exit # 10– Stage 1 external interfaces are satisfactory. • Exit # 11 – Stage 1 software detailed design and DDDs are satisfactory. • Exit # 12– Stage 1 verification and validation plan and VVP are satisfactory

  9. ASI Stage 1 CDR –Exit Criteria # 13-17 • Exit # 13– Stage 1 requirements allocation and RAD are satisfactory. • Exit # 14– Stage 1 baseline and PBR are satisfactory. • Exit # 15- Project risks and actions are acceptable. • Exit # 16 - Project status and PSR are satisfactory. • Exit # 17 - Project is ready for the Stage 1 Build phase

  10. ASI Stage 1 SRR – Entry Criteria # 1-7 • Entry # 1 - A Stage 1 Critical Design Review Report (CDRR) has been written. The SRR reviewers have access to the review version of the Stage 1 CDRR. • Entry # 2 - A Development Project Plan (DPP) has been written. The SRR reviewers have access to the review version of the DPP. • Entry # 3 - An Operations Concept Document (OCD) has been written. The SRR reviewers have access to the review version of the OCD. • Entry # 4 - A Requirements Allocation Document (RAD) has been written. The SRR reviewers have access to the review version of the RAD. • Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD. • Entry # 6 - A Software Architecture Document (SWA) has been written. The SRR reviewers have access to the review version of the SWA. • Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The SRR reviewers have access to the review version of the DDDs.

  11. ASI Stage 1 SRR - Entry Criteria # 8-14 • Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CTR reviewers have access to the review version of the VVP. • Entry # 9 - A Users Manual (UM) has been written. The SRR reviewers have access to the review version of the UM. • Entry # 10 - An Operations Manual (OM) has been written. The SRR reviewers have access to the review version of the OM. • Entry # 11 - An Interface Control Document (ICD) has been written. The SRR reviewers have access to the review version of the ICD. • Entry # 12 - A System Description Document (SDD) has been written. The SRR reviewers have access to the review version of the SDD. • Entry # 13 - A System Maintenance Manual (SMM) has been written. The SRR reviewers have access to the review version of the SMM. • Entry # 14 - Pre-operational code units, external interfaces, ancillary data, and system test data have been integrated into a Stage 1 product processing system in the development environment. The SRR reviewers have access to the product processing system.

  12. ASI Stage 1 SRR - Entry Criteria # 15-20 • Entry # 15 - A Unit Test Plan (UTP) has been written. The SRR reviewers have access to the review version of the UTP. • Entry # 16 - A Unit Test Report (UTR) has been written. The SRR reviewers have access to the review version of the UTR. • Entry # 17 - A System Test Plan (STP) has been written. The SRR reviewers have access to the review version of the STP. • Entry # 18 - A Verification and Validation Report (VVR) has been written. The SRR reviewers have access to the review version of the VVR. • Entry # 19 - A System Readiness Document (SRD) has been written. The SRR reviewers have access to the review version of the SRD. • Entry # 20 - A Project Baseline Report (PBR) has been written. The SRR reviewers have access to the review version of the PBR.

  13. ASI Stage 1 SRR –Exit Criteria # 1-6 • Exit # 1 – Stage 1 CDR "Conditional Pass" items have been satisfactorily disposed of. • Exit # 2 – Stage 1 CDR "Defer" items have been satisfactorily disposed of. • Exit # 3- The project plan and DPP are satisfactory • Exit # 4- The Stage 1 requirements allocation and RAD are satisfactory. • Exit # 5- The Stage 1 algorithm and ATBD are satisfactory. • Exit # 6 - The Stage 1 design documents (SWA and DDDs) are satisfactory.

  14. ASI Stage 1 SRR –Exit Criteria # 7-12 • Exit # 7 - The Stage 1 operations documents (UM, OM, ICD, SDD, SMM) are satisfactory. • Exit # 8 - The Stage 1 delivery procedures, tools, training, support services, and documentation available to the users are satisfactory. • Exit # 9 – Stage 1 system test results and VVR are satisfactory. • Exit # 10 - The Stage 1 project baseline and PBR are satisfactory. • Exit # 11 - The Stage 1 SRRR documents updated status of project risks and actions. The risk status is acceptable. • Exit # 12 - The integrated Stage 1 product processing system is ready for delivery to operations.

  15. ASI Stage 2 CDR –Entry Criteria # 1-6 • Entry # 1 - A Stage 1 System Readiness Review Report (SRRR) has been written. The CDR reviewers have access to the review version of the SRRR. • Entry # 2 - A Development Project Plan (DPP) has been written. The CDR reviewers have access to the review version of the DPP. • Entry # 3 - An Operations Concept Document (OCD) has been written. The CDR reviewers have access to the review version of the OCD. • Entry # 4 - A Requirements Allocation Document (RAD) has been written. The CDR reviewers have access to the review version of the RAD. • Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD. • Entry # 6 - A Software Architecture Document (SWA) has been written. The CDR reviewers have access to the review version of the SWA.

  16. ASI Stage 2 CDR –Entry Criteria # 7-11 • Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The CDR reviewers have access to the review version of each DDD. • Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CDR reviewers have access to the review version of the VVP. • Entry # 9 - A Project Status Report (PSR) has been written. The CDR reviewers have access to the review version of the PSR. • Entry # 10- A Critical Design Document (CDD) has been written. The CDR reviewers have access to the review version of the CDD. • Entry # 11 - A Project Baseline Report (PBR) has been written. The CDR reviewers have access to the review version of the PBR.

  17. ASI Stage 2 CDR –Exit Criteria # 1-6 • Exit # 1 - Stage 1 SRR "Conditional Pass" items have been satisfactorily disposed of. • Exit # 2 – Stage 1 SRR "Defer" items have been satisfactorily disposed of. • Exit # 3– Stage 2 Operations concept and OCD are satisfactory. • Exit # 4– Stage 2 requirements identification is satisfactory. • Exit # 5- Stage 2 requirements analysis is satisfactory. • Exit # 6- Stage 2 requirements traceability is satisfactory.

  18. ASI Stage 2 CDR –Exit Criteria # 7-12 • Exit # 7 - Stage 2 requirements tracking plan is satisfactory • Exit # 8– Stage 2 algorithm theoretical basis and ATBD are satisfactory. • Exit # 9– Stage 2 software architecture and SWA are satisfactory. • Exit # 10– Stage 2 external interfaces are satisfactory. • Exit # 11 – Stage 2 software detailed design and DDDs are satisfactory. • Exit # 12– Stage 2 verification and validation plan and VVP are satisfactory

  19. ASI Stage 2 CDR –Exit Criteria # 13-17 • Exit # 13– Stage 2 requirements allocation and RAD are satisfactory. • Exit # 14– Stage 2 baseline and PBR are satisfactory. • Exit # 15- Project risks and actions are acceptable. • Exit # 16 - Project status and PSR are satisfactory. • Exit # 17 - Project is ready for the Stage 2 Build phase

  20. ASI Stage 2 SRR – Entry Criteria # 1-6 • Entry # 1 - A Stage 2 Critical Design Review Report (CDRR) has been written. The SRR reviewers have access to the review version of the Stage 2 CDRR. • Entry # 2 - A Development Project Plan (DPP) has been written. The SRR reviewers have access to the review version of the DPP. • Entry # 3 - An Operations Concept Document (OCD) has been written. The SRR reviewers have access to the review version of the OCD. • Entry # 4 - A Requirements Allocation Document (RAD) has been written. The SRR reviewers have access to the review version of the RAD. • Entry # 5 - An Algorithm Theoretical Basis Document (ATBD) has been written. The CDR reviewers have access to the review version of the ATBD. • Entry # 6 - A Software Architecture Document (SWA) has been written. The SRR reviewers have access to the review version of the SWA.

  21. ASI Stage 2 SRR - Entry Criteria # 7-11 • Entry # 7 - A Detailed Design Document (DDD) has been written for each software unit in the software architecture. The SRR reviewers have access to the review version of the DDDs. • Entry # 8 - A Verification and Validation Plan (VVP) has been written. The CTR reviewers have access to the review version of the VVP. • Entry # 9 – An External Users Manual (EUM) has been written. The SRR reviewers have access to the review version of the EUM. • Entry # 10 - A System Maintenance Manual (SMM) has been written. The SRR reviewers have access to the review version of the SMM. • Entry # 11 - Pre-operational code units, external interfaces, ancillary data, and system test data have been integrated into a Stage 2 product processing system in the development environment. The SRR reviewers have access to the product processing system.

  22. ASI Stage 2 SRR - Entry Criteria # 12-17 • Entry # 12 - A Unit Test Plan (UTP) has been written. The SRR reviewers have access to the review version of the UTP. • Entry # 13 - A Unit Test Report (UTR) has been written. The SRR reviewers have access to the review version of the UTR. • Entry # 14 - A System Test Plan (STP) has been written. The SRR reviewers have access to the review version of the STP. • Entry # 15 - A Verification and Validation Report (VVR) has been written. The SRR reviewers have access to the review version of the VVR. • Entry # 16 - A System Readiness Document (SRD) has been written. The SRR reviewers have access to the review version of the SRD. • Entry # 17 - A Project Baseline Report (PBR) has been written. The SRR reviewers have access to the review version of the PBR.

  23. ASI Stage 2 SRR –Exit Criteria # 1-6 • Exit # 1 – Stage 2 CDR "Conditional Pass" items have been satisfactorily disposed of. • Exit # 2 – Stage 2 CDR "Defer" items have been satisfactorily disposed of. • Exit # 3- The project plan and DPP are satisfactory • Exit # 4- The Stage 2 requirements allocation and RAD are satisfactory. • Exit # 5- The Stage 2 algorithm and ATBD are satisfactory. • Exit # 6 - The Stage 2 design documents (SWA and DDDs) are satisfactory.

  24. ASI Stage 2 SRR –Exit Criteria # 7-12 • Exit # 7 - The Stage 2 operations documents (EUM and SMM) are satisfactory. • Exit # 8 - The Stage 2 delivery procedures, tools, training, support services, and documentation available to the users are satisfactory. • Exit # 9 – Stage 2 system test results and VVR are satisfactory. • Exit # 10 - The Stage 2 project baseline and PBR are satisfactory. • Exit # 11 - The Stage 2 SRRR documents updated status of project risks and actions. The risk status is acceptable. • Exit # 12 - The integrated Stage 2 product processing system is ready for delivery to operations.