An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CEP/RMP Sediment Coring Study Update RMP CFWG, May 2007

  2. Objectives (this Study) • Better constrain future loads from eroding buried contaminants • Estimate historic loadings of contaminants (especially recent decades) • Characterize contamination with depth to assess current status and likely future changes • Provide data for parameterization and/or evaluation of the multi-box model

  3. Core Sampling Strategy • 17 Cores budgeted • Hybrid (random + deterministic) • 6 samples specifically to understand loading history (wetland deposition zones) • 11 sites to begin representative characterization of Bay sediments • Bay sites vibracore + manual push core, wetlands manually cored (Livingstone)

  4. Distribution of Sites • 3 sites Central Bay, 2 sites each other segments • Preference to RMP repeat stations • CB001S, CB002S, CB006S, • LSB001S, LSB002S, • SB001S, SB002S, • SPB001S, SPB002S, • SU001S, SU002S

  5. Analyses to date • ~10 sections/core for 1+ core per segment • Sections from 30 & 60cm in other core each segment

  6. Results: Suisun • Eroded? – no Cs or Pb profile

  7. Results: San Pablo • Eroding? – Pb and Cs max at top 10cm

  8. Results: Central • Cs and Pb well mixed top 5-10cm • Pb ~4x diff (40 yrs) in 30cm, Cs ~0 >40cm

  9. Results: South • Deposition&Erosion? Well mixed top 10cm • Pb ~4x in 20cm, CS ~0 >20cm • Pb decay and Cs surface max disagree?

  10. Results: Lower South • Deposition? Pb & Cs well mixed top 10cm • Pb ~4x decrease ~30cm, Cs subsurface mixed

  11. Summary • Lead and cesium signals more or less agree for most sites so far • 40-60 years = 30 cm horizon • Top layers highest in Cs many sites • Expect 1960s highest, surface max = static or eroded Bay surface at these sites • Redistributed Cs from eroding sites?