1 / 1

= SAC

Jan. Jul. Jan. Jul. Jan. Jul. = SAC. = Call for Nomination. = Service Selection Boards. = TAB. = Planning Committee. JT&E Program Timeline. JFS. JFS. JFS. 1. 2. 1. 2. 1. 2. CY06. CY07. CY08. Chartered Joint Test. Chartered Joint Test.

glynn
Download Presentation

= SAC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Jan Jul Jan Jul Jan Jul = SAC = Call for Nomination = Service Selection Boards = TAB = Planning Committee JT&E Program Timeline JFS JFS JFS 1 2 1 2 1 2 CY06 CY07 CY08 Chartered Joint Test Chartered Joint Test TAB = Technical Advisory Board – Provide technical review of studies SAC = Senior Advisory Council – Senior Warfighter, Service, OSD group for recommending JFS and Joint Test approval JFS = Joint Feasibility Study – 7 month study to determine if the test is feasible Joint Test = DOT&E chartered test activity funded to answer a joint warfighter issue by conducting a three-year test and evaluation program

More Related