140 likes | 157 Views
E. Mountain Drive Sink Hole. Call received Ms. White March 7 th. Response Richard Navarro March 7 th. E. Mountain Drive Sink Hole. E. Mountain Drive Sink Hole. E. Mountain Drive Sink Hole. E. Mountain Drive Sink Hole. E. Mountain Drive Sink Hole. Old Structure Gravity Stone Wall
E N D
E. Mountain DriveSink Hole Call received Ms. White March 7th Response Richard Navarro March 7th
E. Mountain DriveSink Hole Old Structure Gravity Stone Wall Wall Height: 26’ Repair Structure Steel Pile with Timber Lagging Tie old wall to the new wall Toe Protection
E. Mountain DriveSink Hole Environment Friendly Cost Effective Appropriate Solution Quick Fix Road Open March 29th
Project Funding • Construction Cost $60,000
County of Santa Barbara Project Team Eric Pearson Project Manager John Parsons Inspector Mark Rynkiewicz Construction Engr Charlie Elbert Env. Specialist Md. Wahiduzzaman Engineering Don Phelps Lash Construction