160 likes | 248 Views
FNAL TB09 Plots. Alessandra Borgia Syracuse Unviersity Marina Artuso , Jianchun Wang, Ray Mountain January 20, 2010. Plots that are Ready as of Today. All are complete for both sensors, n- and p-type. Ped and CMS Noise – There are many! Signal vs channel
E N D
FNAL TB09 Plots Alessandra Borgia Syracuse Unviersity Marina Artuso, Jianchun Wang, Ray Mountain January 20, 2010
Plots that are Readyas of Today • All are complete for both sensors, n- and p-type. • Ped and CMS Noise – There are many! • Signal vs channel • Gaussian fits per each sector • Test Pulse • MPV vs link • MPV vs Y Position (mm) for 500 V • Cluster sizes for HV Scan when P type is High Irr • Efficiencies for HV Scan when P type is High Irr Alessandra Borgia, Syracuse University Velo Meeting
Plots Not Ready yet • MPV vs Y Position (mm) for other voltages • ADC vs Voltage projection, slice of MPV vs Y Position at high irr. • Cluster sizes for HV Scan when N type is High Irr • Efficiencies for HV Scan when N type is High Irr • All are in process. Alessandra Borgia, Syracuse University Velo Meeting
Noise Plots N Type – 500V– Pedestal ADCs Channel ADCs Signal + JC Effect Signal N Type – 500V– CMS Alessandra Borgia, Syracuse University Velo Meeting Channel
Noise File Name: RR_0deg_Top_latency_0x17_delay_40ns_Kazu_HV500-20090427-081938.mdf Conditions: Beam at Top N type – Low Irr P type – High Irr N Type – 500V– Ped N Type – 500V– CMS What these plot represent: Plots of the means of Gaussian noise fits for each strip in a sector. i.e. sum of noise in a sector Alessandra Borgia, Syracuse University Velo Meeting
Noise File Name: RR_0deg_Top_latency_0x17_delay_40ns_Kazu_HV500-20090427-081938.mdf Conditions: Beam at Top N type – Low Irr P type – High Irr P Type – 500V– Ped P Type – 500V– CMS Dead chip on p-type will be removed Alessandra Borgia, Syracuse University Velo Meeting
Test PulseN Type: Channels 9 and 30due to timing shift 2 channels are pulsed per link, so 128 channels hit. **Means obtained the same way as the noise,only I pick out the channel that has the signal on it, which I know before hand; plot mean per link. Alessandra Borgia, Syracuse University Velo Meeting
Test PulseP Type: Channels 3 and 24 Alessandra Borgia, Syracuse University Velo Meeting The ADC value should by consistent for each link.
N Type Charge Collection Alessandra Borgia, Syracuse University Velo Meeting
N Type withfluence superimposed Alessandra Borgia, Syracuse University Velo Meeting
P Type Charge Collection Alessandra Borgia, Syracuse University Velo Meeting
P Type withfluence superimposed Alessandra Borgia, Syracuse University Velo Meeting
ADC vs Voltage projection **NB** Of course, will do it properly….wanted to see the shape. Just from eyeballing, this is the shape: JC’s ppt from last week’s SU Velomtg Alessandra Borgia, Syracuse University Velo Meeting
Cluster Size where P type is High Irr at 500V File Name: RR_0deg_Top_latency_0x17_delay_40ns_Kazu_HV500-20090427-081938.mdf Conditions: Beam at Top N type – Low Irr P type – High Irr N Type 500V P Type 500V Alessandra Borgia, Syracuse University Velo Meeting
Cluster Size where P type is High Irr50V File Name: RR_0deg_Top_latency_0x17_delay_40ns_Kazu_HV50-20090427-060008.mdf Conditions: Beam at Top N type – Low Irr P type – High Irr N Type 50V P Type 50V Alessandra Borgia, Syracuse University Velo Meeting
Efficiencies Efficiencies considered when: 1 track from pixel telescope is within ± 100um of cluster position on sensor Alessandra Borgia, Syracuse University Velo Meeting