Home-work 2 Assignment

Home-work 2 Assignment. Report one airport case study article of Airport Business web-site to descript the case how to manage and operate in physical operations and management Case Assignment Dependent on Student No. ( 55 articles as follows ) Format

gore
Download Presentation

Home-work 2 Assignment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Home-work 2 Assignment • Report one airport case study article of Airport Business web-site to descript the case how to manage and operate in physical operations and management • Case Assignment • Dependent on Student No. ( 55 articles as follows ) • Format • Content Format (make point to descript the case ) • E-File: Power-point (10-15 pages) • Submission and Report Dateline • 10th week Monday Proposal

  2. Airport Business -Airport Case Studies Articleshttp://www.airport-business.com/

  3. Airport Case Studies Articles

  4. Airport Case Studies Articles

  5. Assignment 2 Example Copenhagen Airport adapts to low-cost market with new pier Reporter: your name student no.

  6. Content • Introduction (前言) • Unique price differentiation approved(差異化單一價格) • The passenger experience(旅客的經驗) • Industrial, yet colorful look(產業的外觀設計) • Green on a budget(有預算的綠能) • Growing trend for LCC facilities(低成航空公司設施成長趨勢) • Conclusion(結論)

  7. Introduction • LCCs initially focused on secondary airports, the business model has matured and shifted focus, resulting in a major share of today’s development taking place in primary airports • However, most airports have not adapted to the needs of the new customers. A ‘one size fits all’ mentality has prevailed, where business fundamentals such as market segmentation have been ignored because of the scale of investment required. Instead, all airlines have been offered the same product at the same price, no matter which facilities they have a need for. • At Copenhagen Airport, the decision was made to target both types of airlines, satisfying the needs of both network and low-cost airline business models. For the low-cost segment, the result is the brand new pier CPH Go, an investment of 200 million Danish kroner (€27 million), which went under the working name CPH Swift during planning and construction. Rather than being a stand-alone terminal, CPH Go is connected with the international terminals with which it shares check-in facilities, security and shopping areas. Split operations would have driven costs up and the airport reasoned that it has already achieved efficient operations in, for example, its common security area. • Copenhagen Airport was able to ascertain what operational requirements the new facility should be designed to accommodate. A basic, scaled-down concept was developed, which its customer airlines must comply with in order to use the facility. The airline must be able to accomplish 30-minute turnarounds and must not require baggage transfer facilities. At least 90% of passengers must either check-in online, via mobile phone or use airport self-service kiosks, which have been installed in the CPH Go check-in area to limit the number of check-in desks needed. Also, the airline must accept that the check-in area is CPH Go-branded, which better utilises the desks, but leaves no room for the individual airlines’ own brands.

  8. 前言 • 低成本機場之營運核心以二級機場為主,日漸成熟之日亦轉移其營運至主要機場。 • 商務基礎也因投資規模需要取代之市場區隔,航空公司統一機型、單一價格也不需要機場設施。 • 哥本哈根機場的目標市場也要滿足路網、低成本航空兩類型的商務,在低成本航空商務方面,CPH Go投資270百萬歐元在單一航廈及連接國際航廈的共用報到櫃台、購物及保安設施等。 • 哥本哈根機場新的設施可以在30分鐘的週轉時間內完成行李搭機服務,90%的旅客可以在網路、手機或kiosks自我報到,這將取代CPH Go在櫃台報到的需要。

  9. Unique price differentiation approved • A major hurdle for the airport was the need to have a price differentiation between the full-service terminal facilities and the new CPH Go in order to attract LCCs to the new pier. Importantly for the airport’s many full service carrier clients, there would be no discrimination, but a clear distinction between the two products. “You get what you pay for,” • Copenhagen Airport’s fees are subject to state regulation and the passenger charge for using CPH Go is DKK 20 (€2.7) lower than for international passengers in the airport’s other piers. However, as the airport’s charges are lowered overall, the fee for CPH Go is in fact 35% lower than what previously has been offered. • With the number of low cost passengers higher than ever at CPH, there is a raison d’être for CPH Go. A very large part of the low-cost traffic growth seen during the past 18 months has come about exactly because we had announced the opening of CPH Go. Easy Jet is the launch customer and grew by 60% at Copenhagen Airport in 2009. In 2010 this growth will be around 30% driven by the two new routes to Paris and Basel. These routes are specific examples of the importance of CPH Go as a strategic move by the airport, since it is unlikely that they would have become a reality without differentiated facilities and price.”

  10. 差異化的單一價格 • CPH Go為了吸引低成本航空來,與完全服務設施的價格理應差異化,的運送者是沒有差別,但兩種產品很清楚是有差距的。 • 哥本哈根機場費的收取是低於其他機場。 • 哥本哈根機場2009 年Easy Jet成長60%, 2010年增加Paris 和 Basel30%,這些航線則是因無差異化設施與價格成為CPH Go策略參考例子。

  11. The passenger experience • Passengers bound for CPH Go need to go through Pier D, after which the moving walkways and wooden floors end and are replaced with a more basic 310m elevated walkway to reach CPH Go. The five to six-minute walk leads to steps, escalators and lifts that take passengers down to the ground level, where CPH Go spreads out along the apron. • The location of CPH Go is not a coincidence. The six aircraft stands in front of the pier already existed and used to be in use as bus gates.The pier itself has three gates for intra-Schengen flights, one non-Schengen gate and two gates that are flexible and either let passengers through from the pier’s main lounge or from the area behind passport control. In addition to these six primary gates, there are two bus gates, one Schengen and one non-Schengen. These are not scheduled to be used, but provide additional capacity in case of operational irregularities that mean all other stands are taken.

  12. 旅客的經驗 • 旅客前往CPH Go搭機需要經由由D區,走自動走道或木梯盡頭,或由310公尺的電梯或昇降梯就可到達CPH Go ,5至6分鐘的走路搭電梯或昇降梯就可到地面層CPH Go 停機坪。 • CPH Go 有 6 個停機坪(Stand)與 2個巴士門(Gate),有3個門是給Schengen間班次使用,有1 個門是給不是Schengen 的班次使用,另外兩個是給經由主要航廈進出或護照管制彈性使用的門。

  13. Industrial, yet colorful look • With the number of low-cost passengers higher than ever at CPH, there is a raison d’être for CPH Go. A very large part of the low-cost traffic growth seen during the past 18 months has come about exactly because we had announced the opening of CPH Go.” • Nelson and his colleagues wanted to find a style that matched the character of the low-cost carrier concept, something that expressed efficiency, no frills and quick turnarounds. They took inspiration from warehouses that have been converted into modern, trendy offices. While the pier’s epoxy floor and exposed ventilation pipes in the ceiling were entirely taken from industrial architecture, the glass walls and colorful graphics have been added to brand the concept. • Nelson realised the potential of the selected location, which is right before the aircraft stands and near to the airport runways. Making use of these spectacular view opportunities, the whole front wall is glassed, creating an engaging passenger experience. The walls within the building are also all made of glass, not limiting any light or views. In order to keep the front of the building close to the aircraft clear and open, offices, toilets, heating and ventilation systems, whose location is non-essential, were deliberately kept behind the back wall, which is covered in colorful artwork

  14. 產業的外觀設計 • 過去18個月來哥本哈根機場旅客量成長很迅速 • 長堤區(Pier)從倉庫轉換成玻璃牆、現代辦公建築樣式,以提升CPH Go 的品牌。 • 由建築物的玻璃牆可透視外面的停機坪、室內辦公室及廁所等系統一目了然,完全是自由開放的設計,沒有一個空間是不需要的。

  15. Green on a budget • CPH Go is the first project at Copenhagen Airport to make use of a groundwater heating system. In summer, the water is pumped up to cool the building, whereas the water heats the building in winter. This system, which in time will be connected with the rest of the terminal building, greatly reduces energy consumption. • “We have been green on a budget,” Nelson explained. He and his team have made numerous calculations on environmentally friendly ideas. If the green investments were commercially viable, they were incorporated into the plan, however, some ideas had to be dropped at the drawing board. An example of a discarded idea was rooftop solar panels, which – if incorrectly angled – would have caused glare on the aircraft. • CPH Go is a cornerstone in the ‘dual airport’ strategy of Copenhagen Airport, whereby it differentiates between the needs of point-to-point low-cost carriers and full-service network airlines. CPH Go is tailor made to the needs of low-cost airlines. The lower charges of CPH Go form the basis for many new routes and a substantial improvement in Denmark’s international accessibility, and the charges structure means that Copenhagen Airport will strengthen its position in the intensive competition among the major European airports

  16. 有預算的綠能 • CPH Go 規劃地下水地熱系統,於夏天時可以讓Pier這棟建物溫度下降涼爽,冬天可以讓建物溫暖,這套系統亦可以降低能源的耗損。 • 於Pier此棟建築物的屋頂使用太陽能板。 • CPH Go 為哥本哈根機場奠定路網航空業者與點到點低成本業者等雙核(dual)機場需要差異化策略的基石,可藉由CPH Go 低收費形成新航線與擴大丹麥國際的可及性,增強哥本哈根機場在歐洲主要機場密集競爭的地位。

  17. Growing trend for LCC facilities • The opening of CPH Go continues the trend for dedicated LCC facilities, capitalising on the growth of low-cost traffic. mp2 – the dedicated low-cost terminal at Marseille-Provence – opened in 2006 and has subsequently provided a benchmark for the success that can be achieved by such facilities. It played a significant role in helping Marseille-Provence weather the economic crisis – low-cost traffic now accounts for 23% of the airport’s traffic, with a 61.8% increase in passenger numbers at mp2 last year. • Bordeaux’s low-cost ‘billi’ terminal has been similarly successful since its inauguration in June 2010. It is currently used by easyJet and Ryanair and also handles 23% of the airport’s traffic • Other dedicated LCC facilities include Terminal 3 at Lyon-Saint Exupéry, Terminal 2 at Milan Malpensa and Pier H at Amsterdam Airport Schiphol. Further afield, Singapore Changi and Kuala Lumpur International Airport have also opened facilities exclusive to LCCs

  18. 低成本航空公司設施成長趨勢 • Marseille-Provence mp2 於2010年旅客成長61.8% ,低成本航空旅客佔該機場的23% 。 • Bordeaux’s low-cost ‘billi’ terminal 也是成功的,easyJet 與 Ryanair 旅客量佔該機場的 23% 。 • 其他Lyon-Saint Exupéry機場的 Terminal 3, at Milan Malpensa機場 Terminal 2 與阿母斯特丹史基博Amsterdam Schiphol 機場Pier H ,新加坡樟宜機場Singapore Changi and吉隆坡國際機場Kuala Lumpur International Airport也將開放設施給專有的低成本航空公司使用。

  19. http://www.cph.dk/CPH/UK/ABOUT+CPH/Building+for+the+future/CPH+Gohttp://www.cph.dk/CPH/UK/ABOUT+CPH/Building+for+the+future/CPH+Go Please show your concepts after reading the article Conclusion(結論) • 本篇主要敘述哥本哈根機場為吸引與開闢低成本航空公司國際航線,新建了一長堤區(pier),並對低成本航空公司採取低收費。除了採用綠能建築以節省能源,建築物牆面也採用玻璃牆面提供旅客更具現代的、開放的與自由的視覺設計,在作業效能方面也指出CPH Go提高旅客自我報到的比率與旅客搭機步行時間的效率。 • 本篇可作為臺灣國際機場增加國際低成本航空公司航線市場,航空站規劃空間設計與配置理念之參考。 • 最後一段亦列出目前著名的低成本機場的進展,值得進一步討論這些機場成功關鍵因素。

  20. You also can provide the data or figures to clarify some questions CPH Go Pier http://www.cph.dk/CPH/DK/PRESSE/Fotogalleri/luftfoto+ny+finger.htm

  21. 10 things you should know about CPH Go • CPH Go is the first low-cost facility with differentiated prices in a major European airport. Low-cost traffic at Copenhagen Airport has increased significantly since the plans for CPH Go were announced two years ago • EasyJet is the first airline to fly from CPH Go with up to ten daily flights • CPH Go characteristics: • flights are deboarded, handled and boarded within 30 minutes • at least 90% of passengers check in online, via mobile phone or at a self-service kiosk • there is no transfer traffic • It takes 5-6 minutes to walk the 310 metres from Pier D to CPH Go • CPH Go has six flight gates without jet bridge and two bus gatesCPH Go will be the first building to benefit from the airport’s new groundwater cooling system • CPH Go focuses on low energy, saving 75% compared with other parts of the airport • Construction costs for CPH Go amounts to about DKK 200 million • CPH was designed by Vilhelm Lauritzen Architects, who has been an architect for CPH since 1939. • The pier has been designed in an industrial look with large glass panels, that provide a fantastic view of the aircraft landing and taking off • The name ‘Go’ implies an encouragement to travel, to Go