1 / 12

HSB for Donegal

ENGAGE. HSB for Donegal. 12 Feb 2013 • Pat Kidney. Trends in the Irish market. Mobile and FWA broadband services have become a major feature of Ireland’s broadband market Fixed broadband speeds have increased from their previously low level

goro
Download Presentation

HSB for Donegal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ENGAGE HSB for Donegal 12 Feb 2013 • Pat Kidney

  2. Trends in the Irish market • Mobile and FWA broadband services have become a major feature of Ireland’s broadband market • Fixed broadband speeds have increased from their previously low level • Service bundling and closer integration of fixed and mobile services are increasingly prominent features of the market • All mobile operators are engaged in network sharing • multi-band spectrum auction in 2012 has raised EUR 854m 140 MHz of prime sub-2GHz spectrum • The 2.3 GHz and 3.5GHz spectrum bands has potential to further enhance competition and capacity for wireless broadband • National Broadband plan has earmaked EUR175m for broadband

  3. In the 2016 – 2018, a mix of technologies is expected in the Irish telecoms market… UPC will have DOCSIS3.0 in urban areas, but may not reach 55% of pop. LTE and ADSL2 to blue areas (35% pop.) Eircom will use VDSL for high speed broadband, and will maintain its existing ADSL services outside urban areas LTE, DOCSIS3.0, and VDSL to green areas (55% pop.) Only LTE in red areas (10% pop.) Urban 55% Rural 55-90% Final 10% In urban areas LTE will have fibre backhaul to ensure high performance In rural and remote areas the LTE will have microwave backhaul to reduce cost, at the expense of performance DOCSIS3.0 VDSL ADSL LTE

  4. FTTH/GPON FTTC Wireless LTE Cable FTTH/GPON FTTC Wireless LTE FTTC Wireless LTE NSS NSS NSS Up to 90% Up to 90% Up to 90% Nationwide Nationwide Nationwide A comprehensive NGA solution may use FTTH, FTTC, cable, wireless and other technologies Scenario 1: Fibre and wireless Cost of deployment by scenario Scenario 2: Cable, fibre and wireless Scenario 3: VDSL and wireless Source: Analysys Mason

  5. Source: DCENR, H3GI The National Broadband Scheme brought basic broadband to unserved areas of Donegal Target area Actual coverage

  6. NGA is likely to be delivered through a variety of fixed and wireless technologies • NGA consists of many networks – including FTTH/FTTC, cable, and 4G – but how much of each should be built and where? Fibre networks Wireless networks FTTC and FTTH networks require the installation of new fibre links from the local exchange directly to, or closer to, the subscriber. Optimal duct re-use can help reduce costs In addition to wireless infrastructure costs, spectrum fees can be expensive. To support next generation access speeds many base stations may also require high-capacity fibre backhaul links Rely on direct physical connections to the subscriber – capital expenditure generally increases in areas where access distances are greater (typically rural areas) Low-frequency spectrum from the Digital Dividend could extend the reach of LTE base stations and consequently reduce the capital costs of providing next-generation wireless broadband in rural areas A combination of extending the reach of fibre, plus additional wireless sites will be required to satisfy our work and social needs

  7. 100% 90% 80% 70% 60% Proportion of dig costs for FTTH 50% 40% 30% 20% 10% 0% Urban Rural Very rural Why? ….dig costs make up around 65% of total FTTH costs Breakdown of costs of civil works for FTTH Final drop ~50m to premise from DP to DP ~300m from cabinet Route out of exchange ~2km to cabinet from exchange The part of the route closest to the distribution point (DP) represents the highest proportion of costs Source: Analysys Mason

  8. We have analysed each measure from an individual cost–benefit perspective … • Source: Analysys Mason Performs most strongly in a cost–benefit analysis, but may have limited impact in developed markets Reduction to cable damage could lead to significant benefits

  9. 5 investment models… • Choice of investment model Bottom-up Group of end users oversee the contract to build and operate their own local network 5 models Publicdesign build and operate Privatedesign build and operate Public sector owns and operates a network without any private sector assistance Managing Authority provides a grant to private sector to assist in deployment of new network Joint venture Publicoutsourcing Ownership of the network is split between the public and private sector Single contract for construction and operation of network, but public sector retains ownership and some control

  10. Each investment model has its place Choice of investment model Summary of pros and cons of investment models

  11. The focus is on delivering benefit to users • Socio economic benefit must be managed alongside project sustainability to deliver long term benefits • Long term control by public sector can protect end user benefit, however the private operators can bring invaluable expertise • Sustainability is critical as socio-economic benefits will take time • The bottom up model may suit small scale fibre projects • Long term non-profit view of end users suits the fibre business case, but this may be difficult to leverage on a large scale • Open and non-discriminatory access to infrastructure supports effective competition

  12. Contact details

More Related