40 likes | 171 Views
System Online August 20, 2002 15:54:07 CET. 8 th Annual CEENet Network Technology Workshop. Silk Installation Learnings. All cables should be included and shown on the wiring diagram. Cables and connection points should be clearly labeled .
E N D
System Online August 20, 2002 15:54:07 CET 8th Annual CEENet Network Technology Workshop
Silk Installation Learnings • All cables should be included and shown on the wiring diagram. Cables and connection points should be clearly labeled . • Reorganize the SatComm equipment in the rack to leave pre-arranged space for the DataComm equipment and add sufficient power strips. • All assembly hardware (nuts, bolts, cable ties, gaskets, silicon grease, etc.) should be provided, checked and marked.
Silk Installation Learnings • Assembly diagrams, with pictures should be provided showing step by step instructions for mounting the hardware and routing the cables. • A document with basic info about IP configuration (networks, addresses, NetMasks) should be provided. • Include instructions for setting up a local Linux system console. • Include contact info (phone, e-mail) list of persons (or group) who have the knowledge or troubleshooting.
Silk Installation Learnings • Better yet, send an expert with the equipment.