1 / 15

INFN & Globus activities

INFN & Globus activities. Massimo Sgaravatto INFN Padova. Initial tests. Globus installed on 5 Linux PCs in 3 sites (Bologna, CNAF, Padova) Lots of problems accessing the American MDS server !!! Problems with automatic population and update of information Long response time Time out

gpaolini
Download Presentation

INFN & Globus activities

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. INFN & Globus activities Massimo Sgaravatto INFN Padova

  2. Initial tests • Globus installed on 5 Linux PCs in 3 sites (Bologna, CNAF, Padova) • Lots of problems accessing the American MDS server !!! • Problems with automatic population and update of information • Long response time • Time out • Not possible to test other services (i.e. GRAM)

  3. Current status • Italian GIS Server @ CNAF • Globus installed on ~ 15 machines in 8 sites (Bari, Bologna, CNAF, LNL, Milano, Napoli, Padova, Pisa) • WP “Installation and Evaluation of the Globus Toolkit” of the INFN-GRID Project (http://www.pd.infn.it/~sgaravat/ INFN-GRID/Globus)

  4. Objectives • Goal: evaluate the Globus toolkit as a GRID framework providing basic services • Which services can be useful ? • What is necessary to integrate/modify ? • What is missing ? • Duration: 6 months (2000) • Results of this first evaluation used to plan future activities

  5. Tasks • Globus deployment • Security • Information Service • Resource Manager • Data Access and Migration • Fault Monitoring • Execution Environment Management

  6. Globus deployment • Goal: reduce complexity for installation and maintenance  limiting the manpower • “Central” Globus administrators responsible to: • implement and maintain a central software repository • develop tools and documentation to enable local administrators to quasi-automatically install Globus on local resources

  7. Security (GSI) • Implementation of “local” Certification Authority • Relations with other CAs • Integration of existing applications with GSI authentication mechanisms

  8. Information Service (GIS) • Tests on performance and scalability • Results used to define and implement the information service architecture • Tools and interfaces for Grid users and administrators • Integrate the default information with other info, provided by specific agents

  9. Resource Management (GRAM) • Job submission on remote resources that don’t rely upon resource management systems • Evaluation of GRAM with (local) resource management systems (LSF, Condor) • RSL as uniform language to describe resources • Translation from RSL to the specific resource description language • “Cooperation” between GRAM and GIS

  10. Data Access and Migration • Evaluation of GASS APIs to access remote files • Adaptation of existing applications • Evaluation of GASS and GSIFTP for data migration in LAN and WAN

  11. Fault Monitoring (HBM) • Evaluation of services for fault detection for • Globus processes • other “system” processes (i.e. http, ams, …) • “user” processes • Data collectors • Detect and notify about failures • Recovery mechanisms (i.e. automatic restart of crashed processes)

  12. Execution Environment Management (GEM) • Evaluation of GEM as service for code migration • staging of executable • location and/or instantiation of runtime libraries

  13. Deliverables & Milestones • Deliverables • Tools, documentation and operational procedures for Globus deployment (6 Months) • Final report on suitability of the Globus toolkit as basic Grid infrastructure (6 Months) • Milestones • Basic deployment grid infrastructure for the INFN GRID (6 months)

  14. Personnel Contribution • Bari • Maria D’Amato, … • Bologna • F. Semeria • Catania • R. Barbera, E. Cangiano, C. Rocca • CNAF • A. Chierici, R. Cucchi, L. Fonti, A. Italiano, G. Vita Finzi • Lecce • M. Cafaro, L. Depaolis, E. Fasanelli • LNF • A. Martini, E. Pace • LNL • M. Biasotto • Milano • G. Lo Biondo, F. Prelz • Padova • M. Sgaravatto • Pisa • G. Bagliesi, F. Donno, A. Sciaba`, Z. Xie • Torino • C. Anglano, A. Forte, L. Gaido globus@infn.it

  15. First activities & results • Security (see Francesco’s presentation) • GIS (see Giuseppe’s presentation) • GRAM (see Massimo’s presentation) • GARA (see Roberto’s presentation) • Evaluation of GSIFTP (in LAN and WAN environments) • Ongoing tests with Globus 1.1.3

More Related