An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Field Manager’s Review Don Kasten Manager of Technical Operations Center for Advanced Energy Systems IAC Student’s Meeting February 19-20, 2004 IAC Students Meeting, Washington DC. February 19-20, 2004

  2. IAC Centers IAC Students Meeting, Washington DC. February 19-20, 2004

  3. The Big Shots Dr. Michael Muller Director, CAES Dr. David Jones Asst. Director IAC Students Meeting, Washington DC. February 19-20, 2004

  4. Team Leaders Scott Hunter Siddika Pasi Kyri Papadaratsakis Jill Mesonas IAC Students Meeting, Washington DC. February 19-20, 2004

  5. The IT Professionals Fred Glaeser Mike Muller IAC Students Meeting, Washington DC. February 19-20, 2004

  6. Center Administrator Joni Deane IAC Students Meeting, Washington DC. February 19-20, 2004

  7. Student Titles Lead Student- One student with the program for 2-3 years appointed for 1 year. Duties include: • Direct contact between the students and the national program. • Yearly meeting of Lead Students • Share info with other students. IAC Students Meeting, Washington DC. February 19-20, 2004

  8. Student Titles Report Lead - Assigned per Assessment • 2nd or 3rd year student in the program • To compile the report Safety Officer - Assigned Per Assessment • Contact facility about safety regulations • Safety equipment • Monitor safe practices by team. IAC Students Meeting, Washington DC. February 19-20, 2004

  9. ActLog 2004 The Activity Log keeps track of assessments from scheduling to uploading the report. iac.rutgers.edu/Actlog2004/ Everything Starts at the ActLog! IAC Students Meeting, Washington DC. February 19-20, 2004

  10. Actlog 2004 • You must include: • Date of assessment • Lead Faculty/ Staff on assessment • Facility name and contact info • Additional info (example: 2 day assessment, principal product) After completing the assessment, the ActLog must be changed to verify this. IAC Students Meeting, Washington DC. February 19-20, 2004

  11. ActLog 2004 The Report • Completed within 60 days of the visit • Sent to client • Reported to the Field Manager via the ActLog: • In both pdf & datashell formats This is the date we use to gauge timeliness IAC Students Meeting, Washington DC. February 19-20, 2004

  12. Who Wants to Know About the Students? Everyone!!! • List of students and Lead Student every 6 months to FM. • iacforum.org • Names of students on site visit on reports. IAC Students Meeting, Washington DC. February 19-20, 2004

  13. Safety • Plant Safety Training prior to site visit as per the center director. • Liability concerns to be addressed with the center’s university. • A list of helpful safety websites: iac.rutgers.edu IAC Students Meeting, Washington DC. February 19-20, 2004

  14. Site Visits/ Assessments Assessment Visit: • Pre-assessment Forms And Information • Pre-visit Safety Review And Meeting • The Assessment Site Visit • Safety • Think “Outside The Box” • Look For Uncommon But Valuable Recommendation Opportunities (Home Runs) Geocities.com/silliconvalley IAC Students Meeting, Washington DC. February 19-20, 2004

  15. Things to remember when writing reports(we will) • Protocol & Procedure • Units • Incremental Implementation • ARC Codes • Upload Summary Report • Gear The Report’s Tone For Your Audience IAC Students Meeting, Washington DC. February 19-20, 2004

  16. IAC Guidelines The following guidelines are available to aid the IAC centers: • Student Guidelines • Client Guidelines • Web Guidelines • P3 Guidelines- • Other Guidelines iac.rutgers.edu IAC Students Meeting, Washington DC. February 19-20, 2004

  17. Student Guidelines • Student Training • Students should be trained prior to site visit. • PPE, equipment and instrumentation • EERE, Best Practices, and Best Practice Tools • Student Utilization Students should be involved in: • Maintaining their center’s IAC website • Scheduling, assigning and meeting deadlines IAC Students Meeting, Washington DC. February 19-20, 2004

  18. Student Guidelines • Student Experience • Students should not specialize, • Be involved in all center activities. • Employment - Students must be at least 18 years old and be employed by the university IAC Students Meeting, Washington DC. February 19-20, 2004

  19. Program Guidelines- Clients These guidelines helps to determine which clients are eligible to have an IAC Assessment. • Range of Eligible Manufacturers Served • Location and size • Repeat Corporate Clients • Multiple Day Assessments IAC Students Meeting, Washington DC. February 19-20, 2004

  20. IAC Website Guidelines To maintain an IAC website, you must include: • IAC logo/ University Logo • DOE sponsorship of this program • www.energy.gov • www.eere.energy.gov • iac.rutgers.edu/database Required and recommended lists of items are discussed in the guidelines. IAC Students Meeting, Washington DC. February 19-20, 2004

  21. Other Guidelines • Incremental • P3 • Staff Guidelines IAC Students Meeting, Washington DC. February 19-20, 2004

  22. Incremental Implementation • When implementing an AR all at once is not practical or has a high payback period. • Common with Lighting or Motor replacement recommendations IAC Students Meeting, Washington DC. February 19-20, 2004

  23. Incremental Implementation • Savings are based on the number of replacements done each year. • Sum of the savings over the first 2 yrs of implementation. • Imp costs = cost incurred over 2 yrs IAC Students Meeting, Washington DC. February 19-20, 2004

  24. P3 Guidelines- IAC and Productivity • Incorporated productivity recommendations in 1997 • 13% of all the recommendations • 50% of the dollar savings from all recommendations made since 1997! • 2% of all energy savings iac.rutgers.edu/internal/misc/index.php IAC Students Meeting, Washington DC. February 19-20, 2004

  25. Why are we Concerned? • P3 will find energy improvements (if any) the IAC Program can count toward metrics. • Move us toward energy intensity, not total savings A solution would require a new accounting procedure for productivity recommendations. IAC Students Meeting, Washington DC. February 19-20, 2004

  26. P3 • New production resource code – Used when AR affects energy • Allows detector to calculate energy intensity • Field Manager will replace old P1 codes from previous years (1997-2003) IAC Students Meeting, Washington DC. February 19-20, 2004

  27. IAC Interactive Databaseiac.rutgers.edu/database You can search based on: • SIC/ NAICS code • ARC Code • Center • Year • Annual Sales • Energy Costs • # Employees • $ Savings • Implementation Cost • Implementation Status • Description of the AR IAC Students Meeting, Washington DC. February 19-20, 2004

  28. Interactive Database IAC Students Meeting, Washington DC. February 19-20, 2004

  29. Case Studies • Promote and market centers using success stories • Appeal to a variety of different industries IAC Students Meeting, Washington DC. February 19-20, 2004

  30. Case Studies Criteria 2 Different Types: 1.Large % of implemented energy recommendations 2. 1 Big Energy Recommendation We would need: • Pictures • Quotes IAC Students Meeting, Washington DC. February 19-20, 2004

  31. Questions? IAC Student’s Meeting February 19-20, 2004 IAC Students Meeting, Washington DC. February 19-20, 2004