Réunion RISE 2009/2010, Grenoble, 26 Janvier

Réunion RISE 2009/2010, Grenoble, 26 Janvier. RISE Janvier 2010. Volet 1: Intégration matérielle et logicielle. Instrumentation Géosciences Azur Instrumentation LGIT Grenoble. RISE Janvier 2010. NICE : Instrumental development:

gray-pena
Download Presentation

Réunion RISE 2009/2010, Grenoble, 26 Janvier

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Réunion RISE 2009/2010, Grenoble, 26 Janvier

  2. RISE Janvier 2010 Volet 1: Intégration matérielle et logicielle • Instrumentation Géosciences Azur • Instrumentation LGIT Grenoble

  3. RISE Janvier 2010 • NICE : Instrumental development: • revision of infrastructures, new digitalization and real time data transfer for existing stations : • CALF, ARBF, ISO : OK • SAOF : in process • Added to this data flux, some other stations of the PACA region are contributing to the real time analysis: broad band, short period and accelerometric data. The corresponding data flux is available for the whle RISE project. The precision of location and magnitude location in increased, mainly in Ligurian Sea.

  4. RISE Janvier 2010 RISE Network Implementation (January 2010) Red and black Stations are Real Time available (January 2010) Green stations are not yet acquired or installed GeoAzur RISE Project Report 27/01/2010 GeoAzur RISE Project Report 27/01/2010

  5. RISE Janvier 2010 Développements instrumentaux LGIT/UJF Deux sites installés en cours de validation: OGAG, OGDI Deux sites en préparation: OG35, SURF Les sites Suisses (SED) ont été pris en compte pour la configuration Les positions générales des quatre derniers sites sont choisies Deux sites seront prospectés au printemps Organisation du travail mutualisée, embauche d’un AI, garantie sur les 2 ans à venir

  6. RISE Janvier 2010 Stations nord Alpines, Suisses (SED) et Italiennes

  7. RISE Janvier 2010 Sites installées • OGAG mise en route octobre 2009

  8. RISE Janvier 2010 Sites installées • OGDI (Alpes de Haute provence)

  9. RISE Janvier 2010 Sites en cours • SURF • Installation cable enterré EDF et France Telecom • Recherche entreprise, commande partie • Travaux mi-avril

  10. RISE Janvier 2010 Sites en cours d’installation • OG35 • Installation cable enterré • Travaux avril mai

  11. RISE Janvier 2010 Action 4 : Intégration logicielle • Echanges des données brutes, (formes d’ondes) • Archivage des données • Echanges d’informations • Valorisation des données (également volet 3) - Publique • Scientifiques

  12. RISE Janvier 2010 RISE Real Time Data Flow Chart ETHZ Local (Geoazur) Acquisition+ Detection Systems LGIT Local Network (Server) Data Acquisition Seiscomp3 Server Local Network (Server)‏ + Detection system(s)‏ Earthworm Seiscomp3 Genoa Use of 2 automatic earthquakes detection systems (in process)‏ Géoazur Local Network (Server) Local Network (Server)‏ + Detection system(s)‏ GeoAzur RISE Project Report 27/01/2010

  13. RISE Janvier 2010 Earthworm and Seiscomp3 Detection systems implementation and tests Earthworm display (Swarm2 interface)‏ Seiscomp3 display (Built-in interface)‏ Automatic Localization Mailing and Archiving GeoAzur RISE Project Report 27/01/2010

  14. RISE Janvier 2010 Earthworm and Seiscomp3 Detection systems implementation and tests The systems are almost implemented but require to be validated Future implementations consist in: - Technical and operational coordination between Centers - Establishing Earthquake localization exchange + archiving? - Finalizing the network configuration (address network geometry?)‏ - Quality Control on seismic station traces (Dedicated software)‏ - Enhancing localization and seismic source parameters - Seismic picks confirmation? (manual) (Seismologist) - Implementing Adds-on: Moment Magnitude determination (B.Delouis) ... GeoAzur RISE Project Report 27/01/2010

  15. RISE Janvier 2010 Earthworm and Seiscomp3 Detection systems implementation and tests Pro's and Con's of the EW and SC3 systems .......................Ergonomy..................... ..Interactivity (Modification/Manual Picking).. .....................Visualization....................... ..........Modularity (parametrization).......... .........Performances........ .............Reliability............. ......Networking/Data Exchange...... ..Open Sources (Access to system routines).. ..Local Development/ Future Evolution.. Seiscomp 3 +++ +++ +++ To be addressed To be addressed To be addressed To be addressed -- To be addressed Earthworm7.3 -- - -- +++ To be addressed To be addressed ++ +++ ++ GeoAzur RISE Project Report 27/01/2010

  16. RISE Janvier 2010 Traitement des données, LGIT • Les données sont traitées suivant les procédures définies dans RESIF • Contrôle qualité • Répartition des flots • Archivage?? • Le schéma initial

  17. RISE Janvier 2010 Projet architecture Stations propres ACC (RAP) LB RENASS(?) Stations LB des partenaires SSB, ETH, Gênes, Nice, Grenoble Adsl privé Adsl renater « Localisation rapide » Sismalp ACC+LB: Filtrage + détection + localisation Serveurs de données Seiscomp2 (collecte et archivage temporaire) Earthworm (traitements standards) ReNaSS LB : filtré+déclenché (archivage?) RAP ACC : RAP, paramètres temps réels (Archivage LGIT ?) RLBP LB : stocké (6mois?) archivage à ??

  18. RISE Janvier 2010 réalisation architecture Stations propres ACC (RAP) LB RENASS(?) Stations LB des partenaires SSB, ETH, Gênes, Nice, Grenoble Adsl privé Adsl renater « Localisation rapide » Sismalp ACC+LB: Filtrage + détection + localisation Serveurs de données Seiscomp2 (collecte et archivage temporaire) Earthworm (traitements standards) ReNaSS LB : filtré+déclenché (archivage?) RAP ACC : RAP, paramètres temps réels (Archivage LGIT ?) RLBP LB : stocké (6mois?) archivage à ??

  19. RISE Janvier 2010 Valorisation des résultats: installation en cours d’un affichage public en temps réel (ex swarm)

  20. RISE Janvier 2010 • Volet 2: coordination scientifique post-sismique • Démarrage prévu courant 2010

  21. RISE Janvier 2010 • Conclusions: avancement coté LGIT • Volet 1: Intégration matérielle et logicielle • Action 1: • 2 stations installées sur la première années • 2 en cours et finalisées d’ici Juin • 2 prospections en cours • Planning OK pour fin 2011 • Action 4: • du retard • Synchronisation sur RESIF • mise en route localisation rapide • échanges de données à finaliser d’ici fin 2010 • Volet 2: Coordination post‐sismique