1 / 19

Redevelopment of Former Industrial Lands in the Australian Capital Territory

NATO/CCMS Pilot Study June 2005 - Ottawa, Canada. Redevelopment of Former Industrial Lands in the Australian Capital Territory. Toby Hobbs Coffey Geosciences, Australia. An Overview. Site Background Contamination Issues Regulatory Framework The Assessment & Remedial Approach

gregorylong
Download Presentation

Redevelopment of Former Industrial Lands in the Australian Capital Territory

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATO/CCMS Pilot Study June 2005 - Ottawa, Canada Redevelopment of Former Industrial Lands in the Australian Capital Territory Toby Hobbs Coffey Geosciences, Australia

  2. An Overview • Site Background • Contamination Issues • Regulatory Framework • The Assessment & Remedial Approach • Planning & Costing • Management of Project Uncertainties • Assessment • Site Remediation & Restoration • Lessons Learned NATO/CCMS June 2005 - T Hobbs

  3. The Australian Capital Territory NATO/CCMS June 2005 - T Hobbs

  4. Site History • Land Uses: • Government Printing Presses • Government Vehicle Fleets • Government Bulk Fuel Storage Depot • Power Station (Coal & Diesel) • Timber Mills & Construction Depots • Blacksmiths & Metal Fabricators • Maintenance Workshops • Rail Yards • Bulk Warehousing NATO/CCMS June 2005 - T Hobbs

  5. Contamination Issues • Soil • Contamination over large areas (up to 7,000m2) • Contaminated soil at depths of up to 6.5m • 40,000m3 excavated and treated • Inorganic and organic contaminants • Groundwater • A shallow water table(<2.5m depth) • Areas of “free phase” hydrocarbon • Dissolved phase contaminants over many areas including one site of 10,000m2 • Over 4 megalitres of groundwater recovered & treated NATO/CCMS June 2005 - T Hobbs

  6. A High Profile & Sensitive Site NATO/CCMS June 2005 - T Hobbs

  7. Regulatory Processes • Environmental Protection Agreement • ACT Land Development Agency • ACT Environmental Protection Agency • Site Audit Scheme • Independent Government Appointed Advisor/Reviewer A collaborative approach was adopted for the project with a focus on continual improvement and use of best practice methodology NATO/CCMS June 2005 - T Hobbs

  8. Assessment & Remedial Approach • Site history review & technical appraisal • Cost planning • Design of a site-specific Audit Protocol • Staged assessment to address higher risk areas and unlock valuable sites for early development • Adoption of Contaminant Management Plans • Analysis of uncertainty NATO/CCMS June 2005 - T Hobbs

  9. The Kingston Foreshore Precinct Site Audit Areas – A Staged Approach NATO/CCMS June 2005 - T Hobbs

  10. Coping with Project Uncertainty “…the inherent presence of uncertainty is the main cause of remediation project cost and time blow outs” So how did we reduce this inherent project uncertainty in the Australian Capital Territory? • Appropriate land investigations • Use of risk management techniques • Contingency planning • Communication NATO/CCMS June 2005 - T Hobbs

  11. Appropriate Site Investigations • Focus on desired outcomes at the outset • Ask the right questions • Look critically at your work as well as that of others As a minimum, an accurate model of site conditions is required NATO/CCMS June 2005 - T Hobbs

  12. Risk Management Techniques There are significant benefits to be gained through the proactive management of risk • Risk Assessment (Australian Standard AS4360:1999 was adopted) NATO/CCMS June 2005 - T Hobbs

  13. Contingency Planning • Have measures in place to identify potential project issues and risks • “Plan for the worst and hope for the best” • Aim to strike a balance between over- conservative and ‘realistic’ contingency planning NATO/CCMS June 2005 - T Hobbs

  14. Communication of Uncertainties An important but often under-utilised tool: • Communication for all: Project teams, clients, stakeholders & regulators • Communication of uncertainties should: • Start early • Be effective; and • Form part of the core on-going project management strategy NATO/CCMS June 2005 - T Hobbs

  15. Case Study - Remedial Program at Bulk Fuel Storage Depot Recovery & Treatment of Hydrocarbon Based Contaminants • De-watering • “Free phase” product & groundwater recovery • Contaminated soil excavation • On-site water treatment • On-site soil treatment NATO/CCMS June 2005 - T Hobbs

  16. Remedial Works at the Kingston Site NATO/CCMS June 2005 - T Hobbs

  17. Case Study - Remedial Program at Bulk Fuel Storage Depot Innovative Techniques with emphasis on on-site treatment & ESD principles • Critical appraisal of site models • Treatment & re-use of contaminated soil & groundwater • Reduction in contaminant loading at off-site facilities • Re-use of other site wastes for restoration NATO/CCMS June 2005 - T Hobbs

  18. On-Site Treatment of Contaminants at the Kingston Site NATO/CCMS June 2005 - T Hobbs

  19. Lessons Learned • Use of a staged approach and the Site Audit Scheme for dealing with a larger site • Risk management and collaborative approaches adopted with excellent outcomes • Importance of regular and open communication • Social, environment and economic value added NATO/CCMS June 2005 - T Hobbs

More Related