ME4/2 Upgrade Project

ME4/2 Upgrade Project. Laminate production ( M.C.Gill ) Finished -- 580 sheets manufactured (enough for 290 panels) Panel production at Fermilab (thru 27 A pril) 37 new panels machined: 19 anode, 18 cathode (7 per CSC) Machining about 10/week (good match for chamber production)

gretel
Download Presentation

ME4/2 Upgrade Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ME4/2 Upgrade Project • Laminate production (M.C.Gill) • Finished -- 580 sheets manufactured (enough for 290 panels) • Panel production at Fermilab (thru 27 April) • 37 new panels machined: 19 anode, 18 cathode (7 per CSC) • Machining about 10/week (good match for chamber production) • Shipping 35 panels to CERN this week • Chamber assembly (B904 factory) • Factory procedures working well, technicians trained • 5 chambers assembled, tested for leaks • 3 chambers in 2-month longterm HV test • All chamber parts (except panels) at CERN or enroute to CERN • Problems with Au-plated wire breaking during winding • Traced to defective winding of spools at Luma • New spools from Luma work fine – Luma re-winding all spools

More Related