LO 6. Computing the Cost of Unused Capacity. LO 10-6 Design cost management systems to assign capacity costs. Actual activity: Actual volume for the period. Theoretical capacity: Amount of production possible under ideal conditions with no time for maintenance,
E N D
LO 6 Computing the Cost of Unused Capacity LO 10-6 Design cost management systems to assign capacity costs. • Actual activity: • Actual volume for the period • Theoretical capacity: • Amount of production possible under ideal • conditions with no time for maintenance, • breakdowns, or absenteeism.
LO 6 Computing the Cost of Unused Capacity • Practical capacity: • Amount of production possible assuming only the • expected downtime for scheduled maintenance • and normal breaks and vacations. • Normal activity: • Long-run expected volume