An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 10 Quality Control

  2. Learning Objectives • List and briefly explain the elements of the control process. • Explain how control charts are used to monitor a process, and the concepts that underlie their use. • Use and interpret control charts. • Use run tests to check for nonrandomness in process output. • Assess process capability.

  3. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Figure 10.1 Inspection and corrective action during production Inspection of lots before/after production Quality built into the process The least progressive The most progressive

  4. Inspection Inputs Transformation Outputs Figure 10.2 • How Much/How Often • Where/When • Centralized vs. On-site Acceptance sampling Acceptance sampling Process control

  5. Where to Inspect in the Process • Raw materials and purchased parts • Finished products • Before a costly operation • Before an irreversible process

  6. Examples of Inspection Points Table 10.1

  7. Statistical Control • Statistical Process Control: Statistical evaluation of the output of a process during production • Quality of Conformance:A product or service conforms to specifications This is NOT inspection of parts for part quality.

  8. Control Chart • Control Chart • Purpose: to monitor process output to see if it is random (a good thing) • A time ordered plot of representative sample statistics obtained from an on going process (e.g. sample means) • Upper and lower control limits define the range of acceptable variation

  9. Control Chart Abnormal variationdue to assignable sources Out ofcontrol UCL Mean Normal variationdue to chance LCL Abnormal variationdue to assignable sources 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Sample number Figure 10.4

  10. Statistical Process Control • The essence of statistical process control is to assure that the output of a process is random so that future output will be random.

  11. Statistical Process Control • Variations and Control • Random variation: Natural variations in the output of a process, created by countless minor factors • Assignable variation: A variation whose source can be identified

  12. Sampling Distribution Samplingdistribution Processdistribution Mean Figure 10.5

  13. Normal Distribution Standard deviation     Mean 95.44% 99.74% Figure 10.6

  14. Control Limits Samplingdistribution Processdistribution Mean Lowercontrollimit Uppercontrollimit Figure 10.7 Typically, UCL = Typically, LCL =

  15. Observations from Sample Distribution UCL LCL 1 2 3 4 Sample number Figure 10.9

  16. Control Charts for Variables Variables generate data that are measured. • Mean control charts • Used to monitor the central tendency of a process. • X bar charts • Range control charts • Used to monitor the process dispersion • R charts

  17. Control Charts for Variables • Xbar and R Chart: In-Class Exercise – Problem 3, pg. 482

  18. Mean and Range Charts x-Chart Figure 10.10A (process mean is shifting upward) Sampling Distribution UCL Detects shift LCL UCL Does notdetect shift R-chart LCL

  19. Mean and Range Charts x-Chart Figure 10.10B Sampling Distribution (process variability is increasing) UCL Does notreveal increase LCL UCL R-chart Reveals increase LCL

  20. Control Chart for Attributes • p-Chart - Control chart used to monitor the proportion of defectives in a process • c-Chart - Control chart used to monitor the number of defects per unit Attributes generate data that are counted.

  21. Use of p-Charts Table 10.4 • When observations can be placed into two categories. • Good or bad • Pass or fail • Operate or don’t operate • When the data consists of multiple samples of several observations each

  22. P-Charts UCL LCL 1 2 3 4 Sample number Figure 10.9 Note, multiply by 2 instead of 3 If desiring 95% control limits.

  23. Use of c-Charts Table 10.4 • Use only when the number of occurrences per unit of measure can be counted; non-occurrences cannot be counted. • Scratches, chips, dents, or errors per item • Cracks or faults per unit of distance • Breaks or Tears per unit of area • Bacteria or pollutants per unit of volume • Calls, complaints, failures per unit of time

  24. Run Tests • Run test – a test for randomness • Any sort of pattern in the data would suggest a non-random process • All points are within the control limits - the process may not be random

  25. Nonrandom Patterns in Control charts • Trend • Cycles • Bias • Mean shift • Too much dispersion

  26. Figure 10.12 Counting Above/Below Median Runs (7 runs) B A A B A B B B A A B Figure 10.13 Counting Up/Down Runs (8 runs) U U D U D U D U U D Counting Runs

  27. Process Capability Process Capability – a measure of process variation with respect to design tolerances • Tolerances or specifications • Range of acceptable values established by engineering design or customer requirements • Process variability • Natural variability in a process • Process capability • Process variability relative to specification

  28. Process Capability LowerSpecification UpperSpecification A. Process variability matches specifications LowerSpecification UpperSpecification B. Process variability well within specifications LowerSpecification UpperSpecification Figure 10.15 C. Process variability exceeds specifications

  29. Process Capability Ratio specification width process width Process capability ratio, Cp = Upper specification – lower specification 6 Cp = If the process is centered use Cp If the process is not centered use Cpk

  30. Example 8 Cp > 1.33 is desirable Cp = 1.00 process is barely capable Cp < 1.00 process is not capable

  31. Process Capability LowerSpecification UpperSpecification A. Process variability matches specifications LowerSpecification UpperSpecification B. Process variability well within specifications LowerSpecification UpperSpecification Figure 10.15 cp = 1 cp > 1 Cp > 1.33 is desirable Cp = 1.00 process is barely capable Cp < 1.00 process is not capable C. Process variability exceeds specifications cp < 1

  32. Improving Process Capability • Simplify • Standardize • Mistake-proof • Maintain equipment • Upgrade equipment • Automate