Chapter 9. Project Scheduling with Known Activity Times (CPM) . Single-Time Estimate . With Uncertain Activity Times (PERT). Triple-Time Estimate . Considering Time-Cost Trade-offs. Crashing. . PERT/CPM. PERT and CPM have been used to plan, schedule, and control projects.PERT: Program Evaluatio