C-51 West Sub-basin: Updated Analysis of Flow and Phosphorus Data

C-51 West Sub-basin: Updated Analysis of Flow and Phosphorus Data. Kathleen Pietro Gary Goforth. C-51 West Sub-basin. Overview. C-51 West Sub-basin is 75 square miles Sparse data (n=14) available for 1994 Conceptual Plan estimates Project Purpose:

gudrun
Download Presentation

C-51 West Sub-basin: Updated Analysis of Flow and Phosphorus Data

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. C-51 West Sub-basin: Updated Analysis of Flow and Phosphorus Data Kathleen Pietro Gary Goforth

  2. C-51 West Sub-basin

  3. Overview • C-51 West Sub-basin is 75 square miles • Sparse data (n=14) available for 1994 Conceptual Plan estimates • Project Purpose: • Update relationship between Flow and TP outflow for updated performance projections • Apply estimate to 31-year baseline dataset for comparison to Long-Term Plan

  4. Regression Analysis • Used flow and TP data from S-5AE and SR7 sites • Calibration period: 8/97 – 7/01 • Grab TP used if flow • Regression Parameters used: • Ln Flow • Sin/Cos • Smear Coefficient

  5. Note: Data under review.

  6. Regression Analysis Ln[TP (ppb)] = 3.736 + 0.158*Ln[flow(cfs)] + 0.064 *Sin(2*PI*day/365) - 0.128*Cos(2*PI*day/365) Smear coefficient = Sum (Exp (ln(P loads obs) – ln (P loads pred) ) / N

  7. Note: Data under review

  8. Final Steps • Analyze the influence of enhanced regression parameters • Temporal trend • Higher order flow terms • Constrain TP and Flow to POR maxima • Provide recommendation for updated performance projections