Heinz Vincke, DGS/RP, SBLNF meeting 5.12.2012

Residual dose rate at the muon pits & dose rate downstream of the hadron stopper during operation of SBLNF. Heinz Vincke, DGS/RP, SBLNF meeting 5.12.2012. some parameters. Beam momentum 100 GeV/c Beam intensity 4.5×10 13 p/3.6s  200 kW

Download Presentation

Heinz Vincke, DGS/RP, SBLNF meeting 5.12.2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Residual dose rate at the muon pits &dose rate downstream of the hadron stopper during operation of SBLNF Heinz Vincke, DGS/RP, SBLNF meeting 5.12.2012

  2. some parameters • Beam momentum 100 GeV/c • Beam intensity 4.5×1013 p/3.6s  200 kW • Irradiation profile: 180 days of continues beam • Density of Moraine 1.9 gcm-3

  3. Ambient dose equivalent rate at muon pits (1 week cooling) - preliminary results More CPU time/MC–techniques needed to improve statistics  preliminary results Presented in the last meeting • After 1 week of decay: • 1st muon pit: • A few hundred uSv/h inside • ~30 uSv/h at ‘border’ to iron • 2nd muon pit: • OK Hadron stop 2ndmuonpit 1stmuonpit Hadron stop Decay tunnel

  4. Ambient dose equivalent rate in the muon pits(final results) H*10 (after 1week of decay) • … same conclusion as before: • (after 1 week of decay) • 1st muon pit: • A few hundred uSv/h inside • ~30 uSv/h at ‘border’ to iron • 2nd muon pit: • OK Concrete shielding Fe of HS 2ndmuonpit 1stmuonpit Fe of HS End of decay tunnel C-core of HS

  5. Dose rate during beam Position of EHN1? 100 GeVmuon ranged out at 320 m (see M. Calviani’s talk from 19.10.2012) …. at a distance of ~280 m (from target) dose rate < 1 uSv/h EHN1 has ‘permanent workplaces’ with an ambient dose rate limit of 3 uSv/h.

  6. Dose rate during beam (100 GeV/c, 4.5E13 ppp/3.6s->200kW) z- distance from target 3 uSv/h 1 uSv/h • … proposal to use (at least) the 1 uSv/h limit: • to have a safety factor • to allow a possible increase to 300 kW • without RP consequences for EHN1 (radiological re-classification, restricted access in EHN1, etc).