E N D
PV1 PV2 PV4 Short circuit current was measured for four solar modules in the picture on the next page. The results are plotted above. The MSES was faced to the south. Your goal is to match the panels to the plot of their short circuit current. On the next page, identify which panels are PV 1-4.
PV-? PV-? PV-? PV-? N E