1 / 38

Visjon

Visjon . Vi skal utvikle, utfordre og levere. Våre verdier. Vi tar ansvar og tenker langsiktig. Vi er entusiastiske og redelige. Vi har fokus på menneskene. Vi er samfunnsengasjerte. Vår tilnærming. Design og engineering. Vedlikehold og operasjoner. Løfteoperasjoner.

guri
Download Presentation

Visjon

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Visjon

  2. Vi skal utvikle, utfordre og levere

  3. Våre verdier

  4. Vi tar ansvar og tenker langsiktig

  5. Vi er entusiastiske og redelige

  6. Vi har fokus på menneskene

  7. Vi er samfunnsengasjerte

  8. Vår tilnærming

  9. Design og engineering Vedlikehold og operasjoner Løfteoperasjoner Kontroll og sertifisering 3D Offshoretjenester

  10. 3D Vedlikehold og operasjoner Løfteoperasjoner Kontroll og sertifisering Design og engineering Offshoretjenester

  11. Vi løser utfordringene

  12. Trygghet for leveransen og effektiv mobilisering

  13. 9 RIGS ON YARD STAY 225.000 MAN-HOURS OFFSHORE 7.623.000 MAN-HOURS AT YARD 1.146.049 MEALS PREPARED November 2010 Mai 2012 4 PROJECTS ON INTERNATIONAL YARDS 4.704 HIRED WORKFORCE 670.746 ACCOMODATIONS 3 bNOK THIRD PARTY SUPPLIES 4,8 % SICK LEAVE

  14. Omsetning 4 mrd. 3 mrd. 2 mrd. 1 mrd. 2009 2010 2011 2012

  15. Antall ansatte i Westcon Group

  16. HMS

  17. WeCare Improve our personal awareness Emergency preparedness Own brigade External support Performance We work according to a Zero ambition Secure handling of waste

  18. Sykefravær H-verdi 8 % 8 7 % 7 6 % 6 5 % 5 4 % 4 3 % 3 2 % 2 1 % 1 0 % 0 2009 2010 2011 2012 Sykefravær totalt Sykefravær korttid H-verdi

  19. Yards

  20. Ølen

  21. Capasity • Floatingdock WD: 150x26,5x6,6m • Floatingdock ØD: 76x13x5,7 m • 4 deep-water quays for ships and rigs • Craneliftcapasity up to 7600 tons

  22. Karmsund

  23. Capasity • Dry dock: 120x30x8 m • 2 deep-water quays for ships • Ships up to 20 000 dwt

  24. Helgeland

  25. Capasity • Dock hall: 100x28x7 m • 1deep-water quays for ships and rigs

  26. Florø

  27. Capasity • Dry dock: 200x40x7 m • 2 deep-water quays for ships

  28. Power & Automation

  29. Power & Automation • Punkt 1 • Punkt 2 • Punkt 3 • Punkt 4

  30. Power & Automation • Punkt 1 • Punkt 2 • Punkt 3 • Punkt 4

  31. Løfteteknikk

  32. Løfteteknikk • Punkt 1 • Punkt 2 • Punkt 3 • Punkt 4

  33. Løfteteknikk • Punkt 1 • Punkt 2 • Punkt 3 • Punkt 4

  34. Design og enginering

  35. Design og engineering • Punkt 1 • Punkt 2 • Punkt 3 • Punkt 4

  36. Design og engineering • Punkt 1 • Punkt 2 • Punkt 3 • Punkt 4

More Related