An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CHARM Update J. Mekki

  2. CHARM Update • Goal of the facility: • Complexmixed particlefieldpresentwithin the accelerators • Simultaneouseffect (TID, DD, SEE) • In the framework of the R2E project the testing of electronicequipment in a radiation fieldsimilar to CERN acceleratorsis crucial → Assure mid-long termoperationrequirements • Facility not onlyuseful for CERN accelerators but also for : • Groundlevel and atmosphericenvironment(neutron energyspectra) • Spaceenvironment(representative for the inner proton radiation belt) • Size of the test area (severaltens of m3): • Large objectscanbeirradiated • Evenobjects in operationwith services connected (power, cooling…) • Can also host satelittes, part of cars or planes.

  3. East Area Facilities 24 GeV/c proton beam

  4. East Area Facilities 24 GeV/c proton beam IRRAD proton facility PH/DT 24 GeV/c proton beam LHC experiments

  5. East Area Facilities 24 GeV/c proton beam CHARM R2E Project

  6. East Area Facilities 24 GeV/c proton beam Technical local Connection to the radiation area

  7. East Area Facilities 24 GeV/c proton beam Control room Dry run test

  8. East Area Facilities 24 GeV/c proton beam Platform for the Dry Run test of heavy equipment e. g. UPS, Power converters

  9. CHARM 24 GeV/c proton beam

  10. Montrac conveyer • Implementation • Hypertack • 6 NE48 (RadTOL)

  11. News • Schedule: • We are on the way → around 2 monthsbeforegetting first beam → Everypieces/blocks/systems of CHARM are building/mountingeachday. • Commissioningshouldstart in August. • OperationshouldstartduringSeptember up to the 8th of December. • In order to prepare the CHARM operationschedule, the beam time requestform has been sent to the RadWGlist and externalusers. • For the moment someusers (alsoexternal) showedinterest of suchfacility (e. g. BNL, LHC experiments etc…) • FromRadWG, I have not yetreceivedanyfilledform. • Anycommentsregarding the beam time requestform ? • Information: • The new websiteisavailableherehttp://charm.web.cern.ch/CHARM/ • You canalsofind information about the availablecables on-site. http://charm.web.cern.ch/CHARM/Cables.php

  12. Thank you for your attention

  13. Varying Radiation Field Beam Positiontarget in:HEH: >1011cm-2h-1TID: >100 Gyh-1 target out:HEH: >1013cm-2h-1TID: >10 kGyh-1 Beam Pos. Longitudinal Lateral Positions HEH: 108cm-2h-1 – 1011cm-2h-1TID: 0.1Gyh-1 – 100Gyh-1 (gradients to be considered) Full racks, crates, set of cards, componentsHEH: 107cm-2h-1 – 1010cm-2h-1, TID: 10mGyh-1 – 10Gyh-1