LIU Day 2019 - Session 3 Hardware and beam commissioning after LS2 – draft program

LIU Day 2019 - Session 3 Hardware and beam commissioning after LS2 – draft program. A. Huschauer and V. Kain. LIU Beam Performance Meeting, 15 November 201 8. Hardware and beam commissioning after LS2. Contribution 1: Introduction Review of 2018 BCWG activities and achievements

gvalencia
Download Presentation

LIU Day 2019 - Session 3 Hardware and beam commissioning after LS2 – draft program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LIU Day 2019 - Session 3 Hardware and beam commissioning after LS2 – draft program A. Huschauer and V. Kain LIU Beam Performance Meeting, 15 November 2018

  2. Hardware and beam commissioning after LS2 • Contribution 1: Introduction • Review of 2018 BCWG activities and achievements • Outline for activities in 2019/20 • Activity organisation/structure and responsibilities (organigram, …) • Introduce different commissioning phases (dry runs, hardware commissioning, check-out, beam commissioning)  • Contribution 2: Hardware commissioning • Addressing HWC across the injectors • Strategy, Planning, check lists, modifications and verification of available tools • Outline IST during hardware commissioning per machine  • Define required status of controls and applications for HWC • Identify potential unknowns or issues

  3. Hardware and beam commissioning after LS2 • Contribution 3: Readiness of RF equipment • Planning from IST to cold checkout across the injectors with special focus on the SPS • Also mention strategy for LINAC3 • Lessons learnt from Linac4 integration • Define time line for dry runs • Addressing settings management and required tools (including requirements and timeline for new developments) • Planning of slip stacking commissioning • Contribution 4: Operating the injector complex after LS2 • Requirements to improve and facilitate operation after LS2 • From an operational but also controls point of view • Bringing the physics into the control system (settings management, improved LSA-tools interface, optics integration, …) • Timing system (cycle and sequence management) • Establishment of a common body/forum to align concepts and strategies among the injectors • Extended implementation of optimisation and machine learning tools

  4. Hardware and beam commissioning after LS2 • Contribution 5: Linac4 and LBE line commissioning • Planning and goals • Requirements in terms of controls, timing, RF, … • Requirements in terms of applications, implementation of optimization/machine learning tools • Pre-tests for connection • Contribution 6: Beam commissioning - strategy  • Global planning to achieve LIU parameters • Strategy across machines for follow-up and performance tracking • Common scheduling strategies between injectors and LHC, LIU MDs • Definition of setting up strategies • Commissioning of beam instrumentation (wire scanners, ALPS, BGI, …) • Additional manpower requirements • Required tools for performance monitoring

  5. Hardware and beam commissioning after LS2 • Contribution 7: SPS beam commissioning - timeline • Detailed planning for pre-LS2 beam performance recovery until March 2021 • Start-up dates for fixed target physics • Contribution 8: PS beam commissioning - timeline • Detailed planning for pre-LS2 beam performance recovery until March 2021 • Start-up dates for fixed target physics • Contribution 9: PSB beam commissioning - timeline • Detailed planning for pre-LS2 beam performance recovery until March 2021 • Start-up dates for fixed target physics • Contribution 9: Ion beam commissioning - timeline • Linac3/LEIR startup • Slip stacking