NAVICP Lean/Six Sigma Project Forecasting & Planning

NAVICP Lean/Six Sigma Project Forecasting & Planning. Current State Analysis 194,189 forecast recommendations produced annually 96% processed Manually 20% of recommendations accepted 3% Auto-accepted. Future State Solution 114,263 forecast recommendations produced annually

gwenllian
Download Presentation

NAVICP Lean/Six Sigma Project Forecasting & Planning

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NAVICP Lean/Six Sigma ProjectForecasting & Planning Current State Analysis • 194,189 forecast recommendations produced annually • 96% processed Manually • 20% of recommendations accepted • 3% Auto-accepted Future State Solution • 114,263 forecast recommendations produced annually • Reduced manual review by 45% • 44% of recommendations accepted • 26% Auto-accepted • Eliminated repeat cancellation items • Removed non-automatic action codes • Eliminated low-yield recommendations • Raised auto-processing dollar thresholds

  2. Immediate On-Site SupportNAVAIR AIRSpeed Type Study: BB/GB Goal: Speed engine mobilization deployment to CONUS and OCONUS Current State Analysis • CONUS 5 Days • OCONUS 12 Days Future State Solution • CONUS 1 Day • OCONUS 3 days Savings: Improved customer satisfaction, Aircraft ready for tasking improvement

  3. Current State Analysis 30 plus steps (all serial) 16 queues 8 work-arounds Multiple hard copies 12 review and approval steps 28 day average processing time Future State Solution 15 steps (4 performed concurrently) 4 queues No work-arounds Fewer hard copies 5 review and approval steps 4 day average processing time BFMC Lean Pilot SolutionOutcomeReimbursable Funding Documents to NAVAIR Field Activities • Moved downstream activities up front • Brought all parties to table – expanded IPT • Removed WAIT time (queues) • Ensured complete and accurate product early • Reduced rework/rejects • Leveraged ERP ensuring all financial links match project plan to performing activity

  4. L E A N Improving Engineering & Planning Performance Material Ordering Cell Projected Improvement 92% Flow Time Reduction Reduced duration from 8 Days per JML to 4.5 Hours per JML 44% Productivity Improvement Reduced from 0.9 MD / JML to 0.5 MD / JML ($123,000 per DMP, $182,000 per DPIA) TWD Writing Cell Projected Improvement 75% Flow Time Reduction Reduced duration from 50 days/TWD to 12.4 Days/TWD 34% Productivity Improvement Reduced from 2.25 MD/TWD to 1.48 MD/TWD ($160,000 per SSBN, $344,000 per SSGN, $98,400 per DPIA, $49,200 per PIA) Total Projected Savings for Value Stream $389,000/DMP $539,200/PIA $600,400/DPIA