1 / 8

eBART Project Overview

eBART Project Overview. eBART Construction – Transfer Platform. Integrated Schedule eBART & Caltrans . Current Scope ESP. ESP Construction . ESP Construction. ESP Look Ahead. 8 Active Construction Contracts Upcoming Contracts 3 Miscellaneous Retrofit Contracts

gwidon
Download Presentation

eBART Project Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. eBART Project Overview

  2. eBART Construction – TransferPlatform

  3. Integrated Schedule eBART & Caltrans

  4. Current Scope ESP

  5. ESP Construction

  6. ESP Construction

  7. ESP Look Ahead • 8 Active Construction Contracts • Upcoming Contracts • 3 Miscellaneous Retrofit Contracts • 1 Transbay Tube Liner Retrofit • A-Line Stations (1 or 2 contracts) • A-Line Aerials (Lake Merritt to Coliseum • Anticipated Program Completion 2018

  8. BART Silicon Valley Berryessa Extension Project Alignment

More Related