1 / 30

WP1: A Common Strategy

WP1: A Common Strategy. Pascal Morin (INSU) Ingrid Puillat (Ifremer) Dominique Durand (NIVA). WP1 Context Jerico Vision. Prepare for the future European Network of operational coastal observatories (OCO) through: Better pan-European coordination

gwidon
Download Presentation

WP1: A Common Strategy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP1: A Common Strategy Pascal Morin (INSU) Ingrid Puillat (Ifremer) Dominique Durand (NIVA) PARIS – Maison de la recherche - 24 & 25 May 2011

  2. WP1 ContextJerico Vision • Prepare for the future European Network of operational coastal observatories (OCO) through: • Better pan-European coordination • Increased harmonisation of existing infrastructures • Exchange of know-how and definition of Best Practices • Promotion European OCO through TNA • Agreed deployment strategy PARIS – Maison de la recherche - 24 & 25 May 2011

  3. 1. WP1 ContextJERICO main focus • 1-To set up a European Research Infrastructure for coastal observation as needed in research and Operational Oceanography activities • 2-To define the criteria for a Label JERICO (set of parameters, frequency, sampling scheme, data quality, data delivery…) • 3- To sustain networks which are in compliance with Label criteria to secure long term series of data. • 4-To provide opportunities to access to plate-forms for testing/demonstrating experiments and data for assimilation experiments • 5- Better use of R/V, fishing boats & ships of opportunity • 6- Develop a partnership strategy to operate the pool of Gliders in Europe (technical expertise for both vehicle and sensors, operational strategy). PARIS – Maison de la recherche - 24 & 25 May 2011

  4. 1. WP1 ContextRole of WP1 PARIS – Maison de la recherche - 24 & 25 May 2011

  5. 2. WP1 objectivesIntegrating • Define the rules for a better coordination at European level • Identify gaps in existing OCOs • Launching a European strategic view on OCO • Creating a JERICO label • Organizing a Forum for Coastal technology • Promote open access to JERICO network • Provide cross-regional integration and demonstration • Suggest a roadmap for a deployment strategy • Coordinating networking actions for optimal integration of knowledge and consensus PARIS – Maison de la recherche - 24 & 25 May 2011

  6. 3. Tasks of JERICO WP1 T1.1 : Set up the scene and implementation plan • Roadmap for the project (WP by WP) • Coordination of WP results • Share the experience with other projects • Agreeing on definitions and rationale sustaining analysis of existing observatories • Glossary, priority list of measured variables • Cooperation with Australian Integrated Marine Observing System (IMOS)… • Terms of Reference of the Forum for Coastal Technology • Analysis of existing facilities • User committee (EEA, EuroGOOS, Marine Board, …) PARIS – Maison de la recherche - 24 & 25 May 2011

  7. 3. Tasks of JERICO WP1 T1.1 : Set up the scene and implementation plan • Task leader: INSU • Support from: NIVA, Ifremer • Contributors: all • Deliverables: • Report on rationale and definition for a common strategy (M9) • ToR for the FCT (M9) • Contribution to final report (M48) PARIS – Maison de la recherche - 24 & 25 May 2011

  8. 3. Tasks of JERICO WP1 T1.1 : Set up the scene and implementation plan • Main deliverable: • An e-forum where a glossary will be presented and discussed. • This glossary documents : • outputs of previous projects • definitions and methods of, for instance: priority variables to measure, standards on quality assurance (methods), … • guidelines and technical guides and manuals • setting the terms of reference of the FCT • analysing the present successes and gaps of the existing facilities: • Relevance of the data • Quality of the data • Qualification processes of sensors • Benefit optimization • This is an input for other WPs work PARIS – Maison de la recherche - 24 & 25 May 2011

  9. 3. Tasks of JERICO WP1 T1.2 : JERICO Label • Set of criteria to be applied in order to make choices for the specifications of coastal observatories. • Mandatory aspects, from point of view expressed and experienced in JERICO • Consensus to be reached through WP3 and 4 • Recommended solutions or options • Compliance with SeaDataNet, MyOcean and EMODNet PARIS – Maison de la recherche - 24 & 25 May 2011

  10. 3. Tasks of JERICO WP1 T1.2 : JERICO Label • Step 1: defining what is the Jerico label: • to define topics relevant for the label (topic criteria) • review of the existing label document (ESONET) • gaps to complete • Step 2: definition of criteria to be applied to JERICO observing systems PARIS – Maison de la recherche - 24 & 25 May 2011

  11. 3. Tasks of JERICO WP1 T1.2 : JERICO Label • Task leader: HCMR • Contributors: Puertos de Estado, HZG, CEFAS • Deliverables • JERICO label definition (M18) • Contribution to final report (M48) PARIS – Maison de la recherche - 24 & 25 May 2011

  12. 3. Tasks of JERICO WP1 T1.3 : Forum for Coastal technology • To implement a forum to encourage communication and collaboration between stakeholders and private companies • To ensure technologies developed by industry meet the requirements of long term operational systems • To animate a scientific secretariat to organise meetings, WGs and disseminating the outcomes = Subcontracting to Pole Mer PARIS – Maison de la recherche - 24 & 25 May 2011

  13. 3. Tasks of JERICO WP1 T1.3 : Forum for Coastal technology • Task leader: IM • Contributors: Ifremer • Milestones/Deliverables • ToR (M9) • First FCT (M18) / report (M24) • 2nd FCT (M30) / report (M36) • Contribution to final report (M48) PARIS – Maison de la recherche - 24 & 25 May 2011

  14. 3. Tasks of JERICO WP1 T1.4 : Definition strategy and interfaces with biodiversity observatories • to prepare an implementation strategy for the optimisation of long term observations to monitor state and evolution of marine biodiversity • Linked with Jerico label • to investigate the potential of existing observatories of biodiversity to define interfaces with a future network PARIS – Maison de la recherche - 24 & 25 May 2011

  15. 3. Tasks of JERICO WP1 T1.4 : Definition strategy and interfaces with biodiversity observatories • Task leader: NIOZ • Contributors: possibly all • Milestones/Deliverables • Proposed strategy for biodiversity (M36) • Contribution to final report (M48) PARIS – Maison de la recherche - 24 & 25 May 2011

  16. 3. Tasks of JERICO WP1 T1.5: Roadmap for the future • Synthetize outcomes from all other WPs • Translate outcomes from FCT into recommendations • Establish a GIS map for the future European network of OCO • Based upon the gap analysis (WP1 &2), network optimization (WP9) and new observing potentials (WP10) • Contribute with recommendations to the ERAnet SEAS-ERA • Disseminate recommendations to targeted stakeholders through an open seminar PARIS – Maison de la recherche - 24 & 25 May 2011

  17. 3. Tasks of JERICO WP1 T1.5: Roadmap for the future • Task leader: INSU • Contributors: all • Milestones/Deliverables • Roadmap for the next decade (nominal M48) PARIS – Maison de la recherche - 24 & 25 May 2011

  18. 3. Tasks of JERICO WP1 T1.6 : User modality Access for the Trans National Activities Management of the Trans-National Access to selected installations of the JERICO network. SubTask 1.6.1: Preparation of the call – peer review - Setting the “Selection Panel” - Drafting the call - Drafting the guidelines for evaluation - Meetings of the Panel SubTask 1.6.2 : Information and reporting activities - Drafting the specifications of the web site (call section), managing its construction and implementation. - Managing the calls (call opening, proposals reception and transmission to the targeted providers for pre-screening technical review). - Access reporting and information. PARIS – Maison de la recherche - 24 & 25 May 2011

  19. 3. Tasks of JERICO WP1 T1.6: User modality Access for the Trans National Activities • Task leader: CNR • Contributors: all TNA-WP8 partners • Milestones/Deliverables • 1st call for TNA (M8) • 2nd call (M20) • 1st report for access activity (M24) • 2nd report for access activity (M42) PARIS – Maison de la recherche - 24 & 25 May 2011

  20. End of part 1 WP 1 PARIS – Maison de la recherche - 24 & 25 May 2011

  21. 4. Ultimate goal • Roadmap for future implementation and deployment of OCOs in Europe • Through • Harmonisation of strategies, technologies and methodologies • Identification of gaps and plan for filling in gaps • Accounting for new environmental, research and service requirements • Accounting for new technologies PARIS – Maison de la recherche - 24 & 25 May 2011

  22. 4. Challenge • from fragmented knowledge, know-how and strategies to A Common Strategy PARIS – Maison de la recherche - 24 & 25 May 2011

  23. 4. Cross-cutting coordination NA Existing technologies Gaps 3.1.4 / 3.3.4 TNA TOP Proof-of-concept JRA New technologies PARIS – Maison de la recherche - 24 & 25 May 2011

  24. 4. Coordination of NAs Forum Coastal Tech. WP2: Overview of Regional components WP3: Overview of Technologies & Harmonization WP4: Operation & Maintenance Harmonization Gaps Best practices JERICO LABEL PARIS – Maison de la recherche - 24 & 25 May 2011

  25. 4. Preliminary Roadmap for WP2 • Contribution to definition of a common strategy • Overview on OCO per ROOS • Identification of gaps (parameter, sampling) • Inter-comparison of ROOS strategies • What is there in common? / what should be harmonized? • Definition of trans-regional products • Inputs to WP3 and 4 • Overview of observing approaches at ROOSes • Available parameters/variables • Sampling in space and time • Overview on plateform • Overview of technologies • Overview of methods PARIS – Maison de la recherche - 24 & 25 May 2011

  26. 4. Preliminary Roadmap for WP3 • Contribution to definition of a common strategy • Discrepancies between OCOs • Technologies • Practices • Agreement on a set of parameters • Recommendations for ad-hoc technologies • Approach for harmonization • Best practices on operating/managing platforms • Inputs to WP4 • Aspects of ferrybox, gliders and fixed platform to be addressed within WP4. • Technologies that require a special focus when it relates to operation and maintenance PARIS – Maison de la recherche - 24 & 25 May 2011

  27. 4. Preliminary Roadmap for WP4 • Contribution to definition of a common strategy • Harmonised procedures for operation and maintenance • Consensual (best) practices on • Calibration • Biofouling prevention • End-to-end quality assurance • Inputs to WP3 • Feedback on operation/maintenance issues that can affect harmonization and best practices of procedures within and between platforms PARIS – Maison de la recherche - 24 & 25 May 2011

  28. Questionnaire WP2, 3, 4 Workshops WP3, 4 WP4 Deliverables WP3 WP2 PARIS – Maison de la recherche - 24 & 25 May 2011

  29. Workshops • Crucial tool for reaching consensus and delivering inputs to the common strategy • Joint workshops WP3 – WP4 • Contribution from WP2 • Joint questionnaire from WP2, 3, 4 • Timeline for organisation • Approach for optimal gathering of information PARIS – Maison de la recherche - 24 & 25 May 2011

  30. That’s All Folks ! PARIS – Maison de la recherche - 24 & 25 May 2011

More Related