The Finnish Three Instrument Package

The Finnish Three Instrument Package. Monitoring boundaries. 4,1 TWh/a (4,6 TWh/a 2003). Voluntary agreements 1997->. Energy Audits 1992->. Subsidies 1992 EAs 1998 EEIs. 0,5 TWh/a. 1,5 TWh/a. Total effect 5,0 TWh in 2002 (not 6,1). Monitoring Energy Audits. 1,5 TWh (2002).

gyala
Download Presentation

The Finnish Three Instrument Package

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Finnish Three Instrument Package Monitoring boundaries 4,1 TWh/a (4,6 TWh/a 2003) Voluntary agreements 1997-> Energy Audits 1992-> Subsidies 1992 EAs 1998 EEIs 0,5 TWh/a 1,5 TWh/a Total effect 5,0 TWh in 2002 (not 6,1)

  2. Monitoring Energy Audits 1,5 TWh (2002) 1,5 Annual Report on EAP since 1994 Energy Audit Clients • Analysis on the EAs • EA volumes (31 building types) • EE measures (30 categories) • Saving potentials and investments • Implementation status of measures • Impact assessment of the EAP ”Data available for all kind of analysis” Subsidy applications ~ 100/year Energy Audit reports ~ 400/year Follow-up questionnaire 1995, 1996, 1999 2000 -> via VA 15 Regional EEDCentres EA Database since 1994 Motiva The Operating Agent • ”Content” • 5.800 buildings • 30.000 EE measures • 350-400.000 individual • numbers EAP Resources: - Monitoring and reporting 1 man year/a (total administration 2,5) - One follow-up on implementation status = 2 man months - System development cost approx. 50 k€

  3. Monitoring Voluntary Agreements 4,1 Annual VA Scheme Report ~400 Enterprises andMunicipalities Annual VA Branch Reports Accession phase data Annual reporting ~ 600/year • Analysis on the VAs • Total consumptions with detail breakdowns • EE measures • savings and investment costs • status of implementation • Impact assessment of the VAs (sectoral) • Various other EE related information • ”Data available for all kind of analysis” 6 Branch Associations VA Database since 1999 Motiva • approx. • 5.800 buildings • 30.000 measures • 350.000-400.000 • individual numbers • stored in database Annual inputs 30...200 figures per report total of 30.000 figures per year Total content some 150.000 figures VA Resources: - Monitoring and reporting total 2,1 man years in 2003 - System development costs approx. 150 k€ Energy Audit Database

  4. What shall, should or may the MS do… • Monitoring systems for EAs and VAs are now serving 100 % national needs • major schemes needs to be monitored – no results, no financing • for small schemes and minor activities impact assessment is enough • Total government expenditure on EAs and VAs is approx. 4 M€/a • - 200.000 € (5 %) is spent annually on monitoring and reporting • Are these monitoring systems in compliance with the Annex IV ? • full scale onsite third-party verification for EAs would cost roughly 1…2 M€/a • (based on the 2…4 % M&V costs still acceptable with EPC) • ”Cost-efficiency of decreasing uncertainty” – an interesting topic to be discussed