An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Planning Execution & Control CPM EHR Catch All 100 100 100 100 100 200 200 200 200 200 300 300 300 300 300 400 400 400 400 400 500 500 500 500 500

  2. Planning for 100 Points Initiation, Planning, Execution, Control, Closing

  3. 5 Stages of Project Management

  4. Planning for 200 The more recent projects use optimized schedules and budgets.

  5. What makes modern project management different from historical project management?

  6. Planning for 300 • What are SOW, PMI, WBS, CPM?

  7. What are abbreviations for Statement of Work, Project Management Institute, Work Breakdown Structure, and Critical Path Method?

  8. Planning for 400

  9. What is a tracking Gantt Chart?

  10. Planning for 500 10% interest rate ROI =?

  11. Execution & Control for 100

  12. What is the look on student’s face when the instructor asks for input? 

  13. Execution & Control for 200 Forming, Storming, Norming, Performing

  14. What are the phases of team building according to Tuckman?

  15. Execution & Control for 300

  16. What is earned value?

  17. Execution & Control for 400 ?

  18. Execution & Control for 500

  19. CPM for 100

  20. Where do you show latest finish time in a network diagram?

  21. CPM for 200

  22. What is the estimate for duration of a task when the optimistic, realistic and pessimistic estimates are 5, 6 and 7 days?

  23. CPM for 300 ?

  24. 7 wks

  25. CPM for 400What is the critical path in the following activities on arc network?

  26. CPM for 500 Slack

  27. What is the difference between earliest start and latest start time?

  28. Electronic Health Records for 100 Clinical Workstations Clinical Data Repositories Medical Record Document Imaging Systems Master Patient Index for a Single System or Site of Care Master Person Index or Enterprise Directory to Support Multiple Facilities Integration/Interface Engines Networks Data Warehouses Web-based Personal Health Records

  29. What are the common components of Electronic Health Records?

  30. Electronic Health Records for 200 They do not have it.

  31. US medical groups' adoption of EHR (2005)

  32. Daily Double Electronic Health Records for 300 x 2 It reduces time spend in wrong projects

  33. What is the benefit of Portfolio Project Management?

  34. Electronic Health Records for 400 Increases medication errors in some Intensive Care Units, reduces drug-drug interaction

  35. What is the impact of Computerized Physician Order Entry on medication errors?

  36. Electronic Health Records for 500 What happened?

  37. Computerized Physician Order Entry was implemented. 

  38. Catch All for 100 NGT

  39. What is Nominal Group Technique abbreviations?

  40. Catch All for 200 Postpone evaluation

  41. How do NGT, Delphi and IGP improve teamwork and meetings?

  42. Catch All for 300 Improves accuracy of estimates of duration of activities from groups of experts.

  43. What is the benefit of Estimate Talk Estimate technique?

  44. J. Gordon Davis, PhD E. A. “Ned” Engman Susan Gallagher Eric Jenett James R. Snyder Catch All for 400

  45. Who were the founders of project management institute?

  46. Catch All for 500 Because they do not put in places the necessary changes in the business process