BROADBAND NIGERIA: THE JOURNEY AHEAD. Austin Okere C.E.O. COMPUTER WAREHOUSE GROUP. A cry for help. broadband statistics. SPEEDS (mbps) Ghana - 10.1 South Africa - 2.95 Nigeria - 1.38 Global average - 8.48. Broadband in Ghana. Broadband in SA. Broadband in Nigeria.

hachi
Download Presentation

BROADBAND NIGERIA: THE JOURNEY AHEAD

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BROADBAND NIGERIA:THE JOURNEY AHEAD Austin Okere C.E.O. COMPUTER WAREHOUSE GROUP

  2. A cry for help

  3. broadband statistics • SPEEDS (mbps) • Ghana - 10.1 • South Africa - 2.95 • Nigeria - 1.38 • Global average - 8.48

  4. Broadband in Ghana

  5. Broadband in SA

  6. Broadband in Nigeria

  7. Network service providers • entrepreneurs in in the value chain • More providers means • More infrastructure to increase access • More competition to decrease prices • Possible intervention • Facilitate market entry • Support sustainable existence of all players • Segmentation for fair competition

  8. Ample capacity at shore • International access is good • Very good submarine and satellite capacity • One operator has 1.92 TB • A second consortium is adding 5.0TB • an operator spent $250m on undersea cable • Prices have gone from $1300 to $350/mbps • Yet only 2% of capacity inshore • Price target of $86/mbps based on supply • Prices may reach $25/mbps with right volume

  9. capacity limitations Inland

  10. Some problems along the way… • NLDO is challenged • There is core network fibre to 27 states • Operate as islands • Cost is high (4 times international trunk) • Access is discriminatory • Possible intervention • Open Access National Backbone • Interconnectivity • Establishment of price framework

  11. More bottlenecks on the way • RLDO is seriously challenged • Some states not linked to the National backbone • Many key cities yet to be linked • Right of way hindrance & cost • Lack of national interconnection • Possible intervention • Fiscal incentive (long term loans, USPF) • Right of way support/incentive

  12. Metro Distribution is worse hit… • Less than 6% penetration • Interconnection issues • Right of way and barriers to deployment • Multiple and illegal taxation • Multiple regulation e.g. Masts & Base stations • Possible intervention • Fiscal incentive support • Simplification of licensing process • Solving right of way and taxation issues

  13. Metro Ring Provider

  14. Race to the Bottom • Major concerns • Majority of service providers have become moribund • substantially lessening competition • Almost all medium sized operators (mostly Nigerian start ups) are failing • This group is critical to vibrant competition and prevention of oligopoly in the market • Possible intervention • Closer regulation of anti-competitive practices • Fiscal incentives through special purpose funds e.g. USPF • Dealing with transmission market incongruences in prices and access • Digital Access Broadcasting policy and regulatory framework

  15. The Rat Race…

  16. Thinking outside the box

  17. Crux issues • role of Government • Role od service providers • Requirements of service providers to • Roll out to rural areas • Underserved areas • Possible quick wins • Establish true cost of right of way (1 km of Fibre) • How to optimize frequency segment