May DRWG PRD/DR ATT Cutover Issues 1. Requesting permission for load changes of >= 5 MW (Reference Market Rule 1 III.E.5.1) Contact is by DDE via Telephone to Control Room DDE’s have the number to call. Call must be made between 15 and 60 minutes prior to the start of the interruption.

hagen
Download Presentation

May DRWG PRD/DR ATT Cutover Issues 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. May DRWG PRD/DR ATT Cutover Issues 1 • Requesting permission for load changes of >= 5 MW (Reference Market Rule 1 III.E.5.1) • Contact is by DDE via Telephone to Control Room • DDE’s have the number to call. • Call must be made between 15 and 60 minutes prior to the start of the interruption. • Control Room will set a Denied Flag in the event that an interruption is denied. • Not required for an OP4 Dispatch • Required for Transitional Demand Response DA cleared or RT eligible hours

  2. May DRWG PRD/DR ATT Cutover Issues 2 • Change in Notice Required for Requesting an Audit for the Following Month • Now Require 7 business days’ notice • This is to allow for audit plans to be set early in a month, and to resolve any concurrent audit requirements • Audits requested for the window to start in-month continue to have a 1 day notice requirement, which is coded into the DR-ATT

  3. May DRWG PRD/DR ATT Cutover Issues 3 • Incremental Gen Update • We will begin to approve new incremental gen assets when new BLTS system is released expected on May 10 • All changes must respect T-7 boundary • We will work with Participants on any issues, including mapping restrictions. • ‘New’ assets must be mapped to same resource as retiring assets. • For retiring assets, performance through May 31 will continue to be submitted via DRMUI until May resettlement in October. • ‘New’ asset’s must have baseline in time for June model cut.

  4. May DRWG PRD/DR ATT Cutover Issues 4 • DRMUI will be unavailable for about 12 hours during the PRD BLTS Release, currently scheduled for May 8-9. • We will provide a notice of the outage when the date and times are finalized. • DRMUI Performance on May 10 may be below normal • DR-ATT may be unavailable for about 3 hours on May 9