1 / 17

Settlement Agreement October - December 2008 Prepared for the Technical Oversight Committee

Settlement Agreement October - December 2008 Prepared for the Technical Oversight Committee March 24, 2009. A.R.M Loxahatchee National Wildlife Refuge Monthly Total Phosphorus Geometric Mean Concentrations. Loxahatchee National Wildlife Refuge Total Phosphorus Compliance Tracking.

hagop
Download Presentation

Settlement Agreement October - December 2008 Prepared for the Technical Oversight Committee

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Settlement Agreement October - December 2008 Prepared for the Technical Oversight Committee March 24, 2009

  2. A.R.M Loxahatchee National Wildlife Refuge Monthly Total Phosphorus Geometric Mean Concentrations

  3. Loxahatchee National Wildlife Refuge Total Phosphorus Compliance Tracking

  4. Refuge TP Compliance Tracking for October 2008 – March 2009

  5. Flow-weighted Mean Concentrations Inflows to ENP through Shark River Slough 12-month FWMC at the end of each water year compared to the TP interim and long-term limits.

  6. Flow-Weighted Mean Concentrations Inflows to ENP through Shark River Slough 12-month FWMC at the end of each month and the composite TP concentration for each sampling event.

  7. Shark River Slough TP Concentration Compliance Tracking

  8. Shark River Slough TP Concentration Compliance Tracking for October 2008 – December 2008

  9. Shark River Slough Daily Flows by Structure

  10. Daily flow at S333 and S334

  11. Shark River Slough Sampling Event Daily Flows andFWMC Daily flow at Shark River Slough structures and the corresponding TP FWMCs for individual sampling events.

  12. TP Flow-Weighted Mean Concentrations Inflows to the ENP through Taylor Slough and the Coastal Basins The 12-month FWMC at the end of each water year compared to the 11 ppb long-term total phosphorus limit.

  13. TP Flow-Weighted Mean Concentrations Inflows to the ENP through Taylor Slough and the Coastal Basins The 12-month FWMC at the end of each month and the composite TP concentration for each sampling event.

  14. Taylor Slough and the Coastal Basins TP Concentration Compliance Tracking

  15. Taylor Slough and the Coastal Basins TP Concentration Compliance Tracking For October 2008 – December 2008

  16. Taylor Slough and S18C Daily Flows Daily flows into Everglades National Park through Taylor Slough and S18C.

  17. Taylor Slough and S18C Sampling Event Flows and FWMC Daily flows at Taylor Slough structures and S18C and the corresponding TP for individual sampling events.

More Related