1 / 1

Customer Name: ___________________________________ Signature: _____________________________

Greenflame Pre-commissioning Checklist. Boiler Serial No. _________________________________ Installation date: _____________ Model. _________________________________ Yes No Is the boiler on a non-combustible base?

hailey
Download Presentation

Customer Name: ___________________________________ Signature: _____________________________

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Greenflame Pre-commissioning Checklist Boiler Serial No. _________________________________ Installation date: _____________ Model. _________________________________ Yes No Is the boiler on a non-combustible base? Is there sufficient access to the boiler?Have clearance guidelines been adhered to ? Can the combustion chamber door open fully to remove the ash pan? Is there sufficient pellets available to commission the boiler? Is the boiler wired to a permanent Live, Earth & Neutral 230V supply? Is there a power supply from a time clock/room stat at the boiler? Can both electrical supplies be isolated at the boiler? Is the flue pipe connected and sealed to the boiler ? Is there a draught stabiliser fitted? Are all bends 45 degrees (if applicable)? Is there access in the flue so it can be cleaned? If the commissioning engineer cannot achieve sufficient draught with the exhaust fan, does the customer agree to alter the chimney to achieve draught? Have flow and return pipes been connected correctly? Is the boiler connected to a buffer tank ? Are the automatic air vent and pressure relief valve fitted? Is the system filled with water and fully vented ? Is there auto by-pass fitted? Customer Name: ___________________________________ Signature: _____________________________ Installer details: Address: ________________________________________________________________ ______________________________________________ Post Code: ________________ Tel: _________________________________ Email: _______________________________ PLEASE RETURN TO TRIANCO FAX 0114 257 1419 or email service@trianco.co.uk Commissioning can only be scheduled when the completed and signed checklist has been returned. Please allow up to 7 working days from the receipt of the checklist for the boiler commissioning date to be arranged. Should the Commissioning Engineer not be able to carry out the commissioning due to the installation not being complete, a call-back charge will apply. Trianco, Unit 7, Thorncliffe Industrial Estate, Chapeltown, Shefffield, S35 2PH T. 0114 257 2300 F. 0114 257 1419 E. info@trianco.co.uk W. www.trianco.co.uk

More Related