Presentation Overview • G. Special exception 10. Applicant: Mid Florida Material Co., Case # SE-11-08-061, April 4, 2013, District 2 • H. Solid Waste Management Facility 11. Applicant: Hubbard Construction Company dba Mid-Florida Materials, modification of a Solid Waste Management Facility Permit for a Construction and Demolition Debris Disposal Facility to a Class III Landfill, District 2
Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation
Communication Prior to this afternoon’s hearing, EPD Staff met with Commissioner Brummer to review the staff report and recommendation that is found in your agenda packet.
Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation
Request Applicant requests approval to modify an existing permit for a Construction and Demolition (C&D) Debris Disposal Facility (landfill), to allow vertical expansion and transition to a Class III Landfill.
Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation
Background Kelly Park Rd Parcel IDs: 14-20-27-0000-00-019, 23-20-27-0000-00-035; Golden Gem Rd (Future) SR 429 SR 441 Ponkan Rd Plymouth Sorrento Rd Haul Routes SR 441
Background Kelly Park Crossing Apopka Existing Mid-Florida Materials C&D Debris Landfill (Future) SR 429 Golden Gem Rd Existing Golden Gem Road Class III Landfill Orange County Borrow Pit
Background ProposedClass III North 100 acres Cells 7 - 10 166 ft 168 ft 120 ft South 120 acres Cells 3 - 6 70 ft 145 ft Natural High Point at 143 ft
Background Permitted C&D Proposed Class III C&D • continue C&D debris in Cells 3-6 • 2 ft soil final cover • no bottom liner • C&D debris in Cells 7-10 • 2 ft soil final cover • no bottom liner • Class III above C&D debris in Cells 3-6 • soil and top liner final cover • no bottom liner • Class III waste in Cells 7-10 • soil and top liner final cover • bottom liner with leachate collection and treatment Class III C&D C&D C&D Class III
Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation
Waivers • Wekiva Study Area “Presumptive Prohibition” • Third-Party Consultant Review of Cell 3-6 Liner Exemption • Less than 5 Feet Between Landfill Base and Seasonal High Water Table, Cells 7-10 • Final Elevations Above Original Grade • Reduced Setbacks on Southern and Portion of Western Boundary • Reduced Landscape Visual Buffer (Trees) • Plans with Grades Depicted at Lines at 2-foot Instead of 1-foot Contour Interval
Waivers Factors to consider for waivers: • Location of real property; • Distance of the proposed solid waste management facility from improvements on adjoining real property; • Effect of the proposed waiver on adjoining property; • Current physical conditions on the real property whereon the solid waste management facility is proposed to be located; • Whether the waiver would be contrary to the public health, safety and welfare and/or adopted plans, policies or ordinances of the county; • Any special conditions applicable to the real property whereon the solid waste management facility is proposed to be located; and • Whether the waiver would diminish the level of environmental protection provided by this article or would otherwise nullify the intent and the purpose of this article.
Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation
Additional Conditions #59-64 • In addition to required surficial aquifer wells, install Floridan aquifer monitoring wells • No disposal of regulated asbestos containing material • Additional visual buffering between trees along Golden Gem Road and along north property line • Reiterate prohibition of Class I landfill • Add north 100 acres to Agreement To Offer Donation, to include the entire 220 acre site • Recycling goal of 50% in two years, and 75% by 2020, to the extent economically feasible
Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation
BCC Action Requested • Approve the request consistent with the Board of Zoning Adjustment’s recommendation and the 9 conditions of approval. • Approval of modification of the Solid Waste Management Facility Permit #SW-232027-LFCD-85/1212 to a Class III Landfill for Hubbard Construction Company, dba Mid-Florida Materials, with waivers and with conditions, for the current permit duration of December 3, 2017.