1 / 19

Zoning Division -and- Environmental Protection Division

Zoning Division -and- Environmental Protection Division. BCC Called Public Hearing on BZA #SE-11-08-061, April 4, 2013 -and- Solid Waste Management Facility Permit Modification Request. APPLICANT: Hubbard Construction Company dba Mid-Florida Materials. September 23, 2014.

halee-dean
Download Presentation

Zoning Division -and- Environmental Protection Division

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Zoning Division -and- Environmental Protection Division BCC Called Public Hearing on BZA #SE-11-08-061, April 4, 2013-and-Solid Waste Management Facility Permit Modification Request APPLICANT: Hubbard Construction Company dba Mid-Florida Materials September 23, 2014

  2. Presentation Overview • G. Special exception 10. Applicant: Mid Florida Material Co., Case # SE-11-08-061, April 4, 2013, District 2 • H. Solid Waste Management Facility 11. Applicant: Hubbard Construction Company dba Mid-Florida Materials, modification of a Solid Waste Management Facility Permit for a Construction and Demolition Debris Disposal Facility to a Class III Landfill, District 2

  3. Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation

  4. Communication Prior to this afternoon’s hearing, EPD Staff met with Commissioner Brummer to review the staff report and recommendation that is found in your agenda packet.

  5. Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation

  6. Request Applicant requests approval to modify an existing permit for a Construction and Demolition (C&D) Debris Disposal Facility (landfill), to allow vertical expansion and transition to a Class III Landfill.

  7. Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation

  8. Background

  9. Background Kelly Park Rd Parcel IDs: 14-20-27-0000-00-019, 23-20-27-0000-00-035; Golden Gem Rd (Future) SR 429 SR 441 Ponkan Rd Plymouth Sorrento Rd Haul Routes SR 441

  10. Background Kelly Park Crossing Apopka Existing Mid-Florida Materials C&D Debris Landfill (Future) SR 429 Golden Gem Rd Existing Golden Gem Road Class III Landfill Orange County Borrow Pit

  11. Background ProposedClass III North 100 acres Cells 7 - 10 166 ft 168 ft 120 ft South 120 acres Cells 3 - 6 70 ft 145 ft Natural High Point at 143 ft

  12. Background Permitted C&D Proposed Class III C&D • continue C&D debris in Cells 3-6 • 2 ft soil final cover • no bottom liner • C&D debris in Cells 7-10 • 2 ft soil final cover • no bottom liner • Class III above C&D debris in Cells 3-6 • soil and top liner final cover • no bottom liner • Class III waste in Cells 7-10 • soil and top liner final cover • bottom liner with leachate collection and treatment Class III C&D C&D C&D Class III

  13. Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation

  14. Waivers • Wekiva Study Area “Presumptive Prohibition” • Third-Party Consultant Review of Cell 3-6 Liner Exemption • Less than 5 Feet Between Landfill Base and Seasonal High Water Table, Cells 7-10 • Final Elevations Above Original Grade • Reduced Setbacks on Southern and Portion of Western Boundary • Reduced Landscape Visual Buffer (Trees) • Plans with Grades Depicted at Lines at 2-foot Instead of 1-foot Contour Interval

  15. Waivers Factors to consider for waivers: • Location of real property; • Distance of the proposed solid waste management facility from improvements on adjoining real property; • Effect of the proposed waiver on adjoining property; • Current physical conditions on the real property whereon the solid waste management facility is proposed to be located; • Whether the waiver would be contrary to the public health, safety and welfare and/or adopted plans, policies or ordinances of the county; • Any special conditions applicable to the real property whereon the solid waste management facility is proposed to be located; and • Whether the waiver would diminish the level of environmental protection provided by this article or would otherwise nullify the intent and the purpose of this article.

  16. Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation

  17. Additional Conditions #59-64 • In addition to required surficial aquifer wells, install Floridan aquifer monitoring wells • No disposal of regulated asbestos containing material • Additional visual buffering between trees along Golden Gem Road and along north property line • Reiterate prohibition of Class I landfill • Add north 100 acres to Agreement To Offer Donation, to include the entire 220 acre site • Recycling goal of 50% in two years, and 75% by 2020, to the extent economically feasible

  18. Presentation Overview • Communication • Request • Background • Waivers • Additional Conditions • Recommendation

  19. BCC Action Requested • Approve the request consistent with the Board of Zoning Adjustment’s recommendation and the 9 conditions of approval. • Approval of modification of the Solid Waste Management Facility Permit #SW-232027-LFCD-85/1212 to a Class III Landfill for Hubbard Construction Company, dba Mid-Florida Materials, with waivers and with conditions, for the current permit duration of December 3, 2017.

More Related