An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RMI Ports Authority Pacific Aviation Directors Workshop April 5-7, 2005 Radisson Prince Kuhio Hotel, Honolulu, HI

  2. RMIPA Background • RMI Ports Authority (RMIPA) Act of 2003 passed into law on September 19, 2003 • The purpose of the Act is to consolidate the Marshall Islands Port Authority and Marshall Islands Airport Authority into a single Ports Authority responsible for the maintenance and operation of the airport in Majuro and the ports in Ebeye, Jaluit and Majuro • RMIPA did not become fully functional until October of 2004

  3. Mission Statement • To contribute to the economic and social development of the Republic of the Marshall Islands by establishing, maintaining and managing efficient commercial airport and seaport facilities

  4. Composition of RMIPA Board • The Board of Directors consists of 7 members, all of whom are appointed by the Cabinet • The Cabinet designates one of the members as Chairman of the Board • The Minister of Transportation & Communication is not a member of the Board but may give directions to the Board on the general policies to be adopted by RMIPA

  5. Staff of RMIPA • The day-to-day administration and operation of the RMIPA rests with the Director, who is selected by the Board • The Director is assisted by six departmental managers each responsible for the airport, harbors, finance, maintenance, security, and ARFF • There are 54 full-time employees; about 50% are security officers

  6. Staff of RMIPA • 10 of the security officers are cross-trained in aircraft rescue and fire fighting • 3 were recently certified after undergoing a month-long training in basic firefighting under the auspices of the Commonwealth Ports Authority • RMIPA plans to train additional security staff in aircraft rescue and fire fighting next year

  7. ARFF Staff

  8. Cabin Security Inspections • Mandated more than a year ago by TSA on US passenger flights servicing the Micronesian region • The security directive requires that the airline conducts cabin security inspections at all international airports • To do this, all passengers are asked to deplane

  9. Cabin Security Inspections • What has changed since last year? • At each airport (except Kwajalein) only one side of the aircraft is required to deplane; this is done randomly • When it rains, all passengers remain on board while cabin inspections are carried out • Business class passengers are not required to deplane

  10. Majuro Airport Runway Rehabilitation Project

  11. Majuro Airport Runway Rehabilitation Project

  12. Majuro Airport Runway Rehabilitation Project • Notice of Expression of Interest (EOI) advertised in April in Australia, New Zealand, Hawaii, Guam and Marshall Islands • 9 firms registered their EOI: 1 from RMI, 3 from Australia, 1 from New Zealand, 1 from Hong Kong, 1 from Hawaii, and 2 from Guam • Bid documents/RFP issued on March 24

  13. Majuro Airport Runway Rehabilitation Project • Bidding period commences on April 4 and ends on May 30, 2005 (Majuro standard time) • Pre-bid Conference/Site Visit is scheduled for April 13, 2005 at RMIPA offices, Majuro

  14. Majuro Airport Runway Rehabilitation Project • Summary of Scope of Works: • Off-peak construction • Preparation of the existing asphalt surface and construction of the runway asphalt overlay • Construction of a new turnaround bay at the 07 runway end • Runway grooving and application of all runway markings

  15. Majuro Airport Runway Rehabilitation Project • Replacement of existing cables for runway lights • Height re-adjustment of runway edge and end lights • Re-levelling of cable manholes and breathers • Protection of existing water catchment areas adjacent to the runway against contamination • Apron works not included

  16. Majuro Airport Runway Rehabilitation Project Proposed site for contractor’s offices

  17. Majuro Airport Runway Rehabilitation Project • RMI Bid Committee to meet in June to review and evaluate bid submissions • 8 weeks have been allowed for the review and approval process • Award and Notice-To-Proceed to be issued sometime in August 2005 if everything goes on schedule • Construction projected to be completed by April 2006