An evaluation of collection network designs which eliminate the turbine converter. Max Parker Olimpo Anaya-Lara. Overview of connection methods. Star. String. Cluster. Example Wind Farm Layout. 1.2km. 1GW transmission platform rating. ±300kV HVDC link.

haley
Download Presentation

An evaluation of collection network designs which eliminate the turbine converter

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. An evaluation of collection network designs which eliminate the turbine converter Max Parker Olimpo Anaya-Lara

  2. Overview of connection methods Star String Cluster

  3. Example Wind Farm Layout 1.2km • 1GW transmission platform rating. • ±300kV HVDC link. • Turbines: 10MW, Swept diameter 170m. • Spacing: 7 diameters, 1190m. • 10x10 square. 10.8km 1.2km 10.8km

  4. Cable voltage: 52kV AC 70kV DC 7 turbines per string 14 strings Non-tapered cable rating Windfarm Layout, Radial StringsFor string and cluster networks Turbines Redundancy Links Collection Platform

  5. Windfarm Layout, Star Connection 1 Platform Collection voltage: 11kV AC 15kV DC Loop network voltage: 132kV AC ±100kV DC 2 Platforms 4 Platforms 8 Platforms Platforms Outside Platforms Inside HVDC Link Collection Loop network Collection/Transmission

  6. Evaluation of cable lengths

  7. Evaluation of cable lengthsbreakdown of costs Example: AC, platforms inside farm Loss Cost Calculation Lifetime: 20 years Discount rate: 10% Electricity: £36/MWh ROC: £40/MWh

  8. Site and Turbine Parameters Evaluation of losses • Average wind speed: 9.8m/s • Cut-in wind speed: 3m/s • Cut-out wind speed: 25m/s • Rated wind speed: 12m/s

  9. Breakdown of losses

  10. Only cable, platform and loss costs considered at this stage Breakdown of costs