Holy Trinity Cathedral RENOVATION OF INNER DOME 2009

Holy Trinity Cathedral RENOVATION OF INNER DOME 2009. BY ALEXANDER BUILDERS & CO. LTD. First Assessment – HTC inner dome.

haley
Download Presentation

Holy Trinity Cathedral RENOVATION OF INNER DOME 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Holy Trinity Cathedral RENOVATION OF INNER DOME 2009 BY ALEXANDER BUILDERS & CO. LTD.

  2. First Assessment – HTC inner dome First assessment of inner dome cavity to identify make-up of structure and extent of damage. The inner dome support structure was found to consist of a Knogg structure (timber, mesh, mortar and plaster creating an inner dome)

  3. Works commence to reinforce & repair substructure The inner dome support structure was compromised by severe termite infestation leading to cracks in the plaster. This would have to be rectified without affecting or damaging the artisan works painted on the plaster. Pest control was carried out using gas fumigation and residuals by Carib Pest before any works began on the interior structure.

  4. Set-up of support structure EPS foam in blocks was used to support the inner dome so that a small work crew could enter the inner cavity without damage to the face of the plaster throughout.

  5. Set-up of support structure

  6. Set-up of support structure

  7. Set-up of support structure

  8. Set-up of support structure

  9. Set-up of support structure

  10. Set-up of support structure

  11. Entrance to one quadrant of the Inner Dome Work crews entered the 4ft inner cavity through this small crawl space to clear out all debris and affected wood before a new system of structural support was installed.

  12. Inside one quadrant of the four Note the wood structure that had clear signs of termite trails.

  13. Work-In-Progress

  14. Work-In-Progress

  15. Work-In-Progress

  16. Work-In-Progress

  17. Work-In-Progress

  18. Work-In-Progress

  19. Work-In-Progress

  20. Work-In-Progress

  21. The Inner Dome Upon Completion

  22. Moulding replaced with EPS Moulding

  23. Inner Dome Upon Completion

  24. Inner Dome Upon Completion