1 / 13

DET Structured Cabling Standards For small jobs or whole school

DET Structured Cabling Standards For small jobs or whole school. Paul Clark Technology Adviser Sydney Region. NSW Department of Education & Training NSW Public Schools – Leading the Way www.det.nsw.edu.au. The current Standards Doc is August 2006

hali
Download Presentation

DET Structured Cabling Standards For small jobs or whole school

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DET Structured Cabling StandardsFor small jobs or whole school Paul Clark Technology Adviser Sydney Region NSW Department of Education & Training NSW Public Schools – Leading the Way www.det.nsw.edu.au

  2. The current Standards Doc is August 2006 • Mandate? – No but it is highly recommended • Even to check when Commerce of Public works have new cabling installed?

  3. Some Cabling • Not to Standard • Cheaper materials • Reduced Flexibility • Short-term solution • Limited warranty • Redressing issues not supported

  4. DET Cabling • Reduces TCO • Scalable solution • Long term solution Warranty 15-25 yrs • +Certification - +tests • Redressing issues -DET will support

  5. Process for Cabling • Audit of current network components • AMS plans annotated (sample available) • Scope Of Works devised (Power as well) • 3 Cabling quotes from Approved Commerce contractors sought – 1 visit • 2 Week turn around time for quotes • Evaluation – school decides

  6. Hidden Costs • Frustration with intermittent faults • Time consuming tracing - support issue • Requires Replacement NOT rectification • Short Life – poor cable

  7. Future Proofing • Includes Voice Solution • +Single Mode Fibre • Separated PWR/Data • Cabinet sizes (+900mm) • Ready for new DET services • Access to Test Units

  8. DET Inclusions • Compliance with State standards • Provides Working /Tested solution • Clean up • Site inspection • Documentation (Cert)

  9. Exclusions • Patching of new outlets • Removing old cables or outlets • Replacing Display boards – don’t fit

  10. Hardware • Use school purchase • HP switches – sourced from ASI or Matrix-CNI • HP Lifetime warranty 131047 -> select 5 then 3 • Access to Cabinet/Switch exchanges?

  11. Projector Solution • One approved provider - Sound Corp • Joey Panel (Malcolm Cooper / Bob Tickell) • White Board Solution? Wait!!!!

  12. Amplifier Solution • Approved Providers • TCP (Total Concept Projects) • SoundCorp • PA People

  13. Questions?

More Related