1 / 27

OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013

OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013. Implementation of BulRIS Project. BULGARIAN PORTS INFRASTRUCTURE CO. RIS Workshop Danube Commission April 11, 2011 Budapest. Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia. Agenda:. Project Overview

hali
Download Presentation

OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OPERATIONAL PROGRAMME ON TRANSPORT 2007-2013

  2. Implementationof BulRIS Project BULGARIAN PORTS INFRASTRUCTURE CO. RIS Workshop Danube Commission April 11, 2011 Budapest Kuzman Genov ICT Director and BulRIS Project manager, BPI Co. – HQ Sofia

  3. Agenda: • Project Overview • System Components • Tracking & Tracing • Voice VHF Communication System • ERI • Data Gateway • Notices to Skippers • Communication Infrastructure • AIS and VHF Network Layout & Design • Construction Works • What next ? - Phase II and III

  4. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Project overview - General • Project duration 18 Months • Start: May 2010 • End: November 2011 • Contracting Authority: Bulgarian Ports Infrastructure Co. • Budget 5.6 Mil € • Project is co-funded by EFRD - Operational Program on Transport 2007 – 2013

  5. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Project Overview - Project Goals • To establish the required base infrastructure for RIS operation on the Bulgarian part of Danube • Communication infrastructure • Tracking and tracing (AIS) infrastructure • Voice VHF Communication System • ERI • Data Gateway • Notices to Skippers • To apply DIRECTIVE 2005/44/EC of the European Parliament and of the Council

  6. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Project Overview – Implementation Schedule Task 1: Inception report and planing (completed) Task 2: System design (completed) Task 3:Construction (in progress) Task 3: Software development (completed) Task 4: System installation (in progress) Task 5: System integration (Q2-Q3’2011) Task 6: Testing and training (Q3-Q4’2011) Task 7: Migration to real life operation (Q4’2011)

  7. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - Tracking and Tracing • AIS based system • 8 sites • Exchange of actual, safety related information between ships and shore • Client – Server architecture • Web interface • Functions: • Provision of a TTI/STI • Provision of traffic management or fairway information services • Web access for logistic users

  8. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - Tracking and Tracing

  9. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Tracking and Tracing - Additional AIS functions dGPS trough AIS network • Improves the accuracy of the vessel positioning • Functions: • Correction of GPS positioning • Compliant with international recommendations

  10. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System components - Voice VHF Communication Network • 8 sites along Bulgarian Danube • Cohabitation with AIS base stations • Independant system • Integration and data exchange with AIS • Graphic presentation of the vessels position

  11. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - ERI • Allows simplification of cross border procedures • Functions: • Data exchange between vessel and competent authorities • Available via web application • Access according to the user rights • Users: • Vessel parties • Competent authorities • Compliant with European and international standards

  12. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components - ERI

  13. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Data Gateway • National and international exchange of RIS data • Functions: • Provision of relevant RIS data • Interface to T&T, ERI and Hull system • Web based users interface • Users: • Governmental users • Commercial users • Different data access rights have to be defined

  14. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Data Gateway

  15. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Notices to Skippers • Used for fairway information, traffic information and management as well as voyage planning • Functions: • Available via web service • Automatic translation on 23 languages • Input information for voyage planning • Users: • Traffic/Fairway authorities • Harbour Master’s Offices/Port authority • Police • Shippers • Skippers/Captains • Inspection and customs authorities • Compliant with European standards

  16. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Notices to Skippers

  17. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Communication Network • Total of 16 sites • 14 radio reley links • 1 dedicated optical link • 1 MAN link • Interlinked togeather to form a closed network • Network is invisble to outside world • Hack proof • Used for AIS and VHF communication • Real time data replication between Ruse and Varna backup centre

  18. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS System Components – Communication Network

  19. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS AIS and VHF Network - Locations

  20. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS AIS and VHF Network – Radio Coverage (c) Kongsberg Seatex AS

  21. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI of the Client Application 1/2 (c) Periskal

  22. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI of the Client Application 2/2

  23. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI AIS WEB Application 1/2 (c) Periskal

  24. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS GUI AIS WEB Application 2/2 (c) Periskal

  25. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS Construction Works • Scope of works • Design • Evaluation of radiation influence • Obtainig building permits • Site construction • Exploatation permits • 4 new sites • Other sites are existing sites owned by Bulgarian telecom

  26. Implementation of River Information System on the Bulgarian Part of Danube - BulRIS What next? – Phase II and III • Construction of the RIS Center building • Conceptual design finalized • Technical project – start in May 2011 • Construction works – start in fall 2011 • In operation – end of 2012 • Upgrade and development of the services (pre-project study) • Automatic water level measurement/modeling • RIS portal • WLAN access to RIS services • Calamity abatement services • ………………………………………

  27. THANK YOU FOR YOUR KIND ATTENTION Kuzman Genov k.genov@bgports.bg

More Related