Multimodal Integrated Corridor Management What It’s All About
Overview • CSMP Background – How We Got Here • CSMP Status – Where We Are • The Challenge Ahead – What It Takes To Get Where We Need To Be
GM’s FUTURAMA Stretching the Horizon
1971 (42 Miles) 1998 (750 Miles) Los Angeles District 7 TMC
AASHTO Summits • Conducted congestion summits in cooperation with the four regional AASHTO meetings. • Identified innovative strategies and initiatives that states were adopting for dealing with the congestion challenge • To learn from one another about what was possible, and how state DOT leadership could make a difference in improving transportation system performance
Summit Themes • There is no Single Solution • Performance Measurement is a Key to Overcoming Limited Resources • The Extent of the Congestion Challenge Goes Beyond One Jurisdiction’s Boundaries and Requires Collaboration
Performance Poetry • How can you manage if you don’t know what’s happening • How can you show people what to invest in if they can’t visualize that return on investment • How do you challenge people to improve without a vision
Background CSMPs – High Octane System Planning Caltrans – The Mobility Company New Tools – Performance, Simulation, and more
Critical Themes All Jurisdictions All Modes Performance Commitment Plan Corridor Management Plans CMP
Corridor Description Performance Assessment Corridor Team Understanding Analytics Improvements Proposal Plan Components Ongoing
Reliability Safety Mobility Productivity Modern Metrics Performance
Arterial network • 40 miles of arterials • Approximately 250 signalized intersections • 12 major connectors to I-880 Freeway • Traffic signals controlled and maintained by respective local agencies • Different signal control systems
Development Milestones Corridor definition Stakeholder team Preliminary performance assessment Detection in place Comprehensive performance assessment Identify causes of congestion Test improvement scenarios Prioritize recommendations
CSMP Status • 26 Corridors Underway • 7 Detection Projects Moving • Primitive Stage • January Meeting to Determine Future Direction
The Challenge • What are we really going to do • When • Concept of Operations • Managing Across Modes, Jurisdictions & Strategies
What Does It Mean To Manage • Building a House vs Managing a Home • Integrate vs Co-ordinate • Soviet Collectives Revisited