What is a Good SmartSignal Model? Presented by Joe Milton Engineering Manager Reliant

What is a Good SmartSignal Model? Presented by Joe Milton Engineering Manager Reliant. Outline. Reliant generating fleet and OSIsoft PI infrastructure Virtual M&D concept Human factors What is a good model? KPIs and other metrics. Generating Fleet Location and Fuel Type.

Download Presentation

What is a Good SmartSignal Model? Presented by Joe Milton Engineering Manager Reliant

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What is a Good SmartSignal Model? Presented by Joe Milton Engineering Manager Reliant

  2. Outline Reliant generating fleet and OSIsoft PI infrastructure Virtual M&D concept Human factors What is a good model? KPIs and other metrics

  3. Generating Fleet Location and Fuel Type

  4. Common Plant Historian -- OSIsoft PI 29 PI Servers 203 interfaces to various systems 1000+ process displays & reports 350K tags (real-time data points)

  5. OSIsoft PI took care of history and current value but not what the value should be…. We selected SmartSignal to leverage our existing OSI PI infrastructure and predict…

  6. SmartSignal Predictive Maintenance Tool SS takes data from our PI infrastructure (like vibration, temperature, pressure, etc.) and inputs it into a software model. This model shows how a a typical piece of equipment is supposed to operate over various loads and ambient temperatures. If the data goes outside of the predictive model, an alarm is sent to the station for further investigation. Basically, we are making the computer do the work of scanning all of the sensors and instruments in the plant for changes in known equipment behavior.

  7. Defining WatchList Graphing Terms: Actual, Estimate, Residual, Alert, Incident Actual (blue) from OSI PI Estimate (green) generated by SSC models Residual = Actual - Est Alerts (red X) Statistically significant residual value Incident (diamond) multiple samples or sensors showing alerts; drives the WatchList

  8. Typical Results & Additional Terms VSG (green diamond) Virtual Signal Generation was enabled Missing Value (blue X) Signal gave NaN value

  9. Smart Signal – Site WatchList • Models • Can see incidents by clicking the arrow button.

  10. SmartSignal – Site Model Detail Site that you are on. • Incident List – This is a list of incidents on the models. • Chart View –The Blue line is the actual PI data and the Green line is the model data.

  11. SmartSignal-Reliant Scope 67 coal & natural gas power units across U.S. Total 13,450 MW power Rotating & non-rotating balance-of-plant assets monitored 411 assets, 1174 models Turn 30K+ sensors to exception-based monitoring Goals include Early warning of equipment faults & process problems Maximize availability Minimize forced outages Improvement of unit heat rates

  12. Reliant’s “Virtual” M&D Center Staff of three working 5*8 at their own cubes: Review WatchList Email plants when equipment issues are detected Tune Build new models Teach WatchList classes Document issues and model changes. Plant champions Look at the WatchList Use log Deal with the easy ones

  13. Typical Emails to Plant

  14. Typical Plant Response The Plant Champion will commonly use Pi Processbook or Datalink to confirm the item and issue a work order

  15. Example of Full Cycle of a Catch From: Sent: Thursday, November 30, 2006 1:34 PM This is a pretty significant movement on FD Fan Motor outboard bearing (about 17 deg above expected currently). The oil levels are all good and the filters have been changed. The filters were dirty and the temps are dropping on the motor after the change out.

  16. What is a Good Model?

  17. Good Model Brainstorm

  18. Truth Table (Logic) SS Catch SS Catch False Catch True Catch SS no Catch SS no Catch No Machine issue Machine issue

  19. What is a Good Model So Far? Modeling elements It has catches (detects changes) It has no misses (or few) It uses as-found data Human elements It has engaged users

  20. Metrics True Catches Look at the tracking log-equipment/instrumentation catches Missed Catches Long term – Use Power GADS to review major events Was the system modeled? If not, should it be? Build it. If modeled, review and improve the model. No Catches & No Machine Problems Could be a sign of a good program Could mean just wait False Catch Track issues Use log statistics and target problematic models

  21. Catches The table shows true catches and false catches *2006 catches not a full year

  22. False Catch SmartSignal alerts indicate a change from the model data set (State matrix)- A repair could cause a change A new season An operational mode change An abnormal configuration Or bad modeling data

  23. Model with False Alerts Detailed review of this model data set found that it had two modes. A and B with the same Inlet temperature and A down stream of B

  24. Model with False Alerts Detailed review of this model data set found that it had two spikes that were included in the model.

  25. Human Factors How can acceptance be measured? Is the user engaged? What are good KPIs? How can it be made “fair” for peaking and base load unit?

  26. Levels of SmartSignal Utilization basic level is where the WatchList Team (WLT) serves as an M&D center. Plant responds to WLT email questions about their units and WatchList items. the engaged user logs into the WatchList at least once a week (on average). The committed user logs in several times a week (on average). They also add information to the log and clear alerts from the WatchList. The power user exceeds the committed user level by pressing model issues and providing a dialogue about known plant repairs and changes.

  27. Levels of SmartSignal Utilization 2007 – ‘08

  28. KPI Issues Terms like basic, power user work well for a full-year but they did not track seasonal units well We moved to a new metric that is much closer to the desired outcome– If you are running- login

  29. SS Login Ratio “Average number of service hours between logins”

  30. Log Entries • 2007 • 50% of plants had no log entries • 78% of log entries were at one plant “C” • 2008 • Only 10% have no log entries for 2008 • Log entries more evenly spread across fleet • 119% increase in total log entries

  31. Lessons The knowledge of how the plant should run comes from how it has run (PI data) Keeping the messenger alive is part of the task (instruments) Eliminate variables (do not add them) Model to detect changes Exception-based Statistics-based technologies are not common in plant environments. Tools are not complete solutions – People still have to act

  32. Questions?